Lynchburg city has 58 scored datacenter candidate sites averaging 54.7/100 DC Readiness, with a catalogued aggregate of 3,900 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Lynchburg city, Virginia has 58 scored datacenter candidate sites averaging 54.7/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 28th of 122 Virginia counties by number of sites and 33rd by average score. The top-scoring site is JOSHUA FALLS · 8aa51d0c at 66.6/100.

58
Candidate sites
54.7/100
Avg DC Readiness
3,900 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Lynchburg city

Site-selection context for Lynchburg city

Yessales_tax_exemption
Datacenter tax incentive
7.67¢/kWh
Commercial electricity
5.33¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Lynchburg city compare with other counties in Virginia?

By number of scored sites, Lynchburg city ranks 28th of the 122 Virginia counties with a county page, holding 1.0% of the state's 5,871 sites. Its average DC Readiness of 54.7/100 ranks 33rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 642nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 21 score 55 or higher.

What types of datacenter sites are in Lynchburg city?

Shovel-Ready sites are the most common (23, 40% of the county's inventory), followed by substation-adjacent (19) and industrial (13). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Lynchburg city?

Industrial electricity averages 5.33¢/kWh and commercial 7.67¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,900 an acre.

By site type

Top datacenter sites in Lynchburg city

Top datacenter sites in Lynchburg city
SiteTypeVoltageCapacityQueue waitScore
JOSHUA FALLSSubstation-Adjacent765 kV1,000 MW5.1 yrs66.6
OZ LynchburgGreenfield——5.1 yrs61.9
Greenfield (CLOVERDALE 765KV - JOSHUA FALL)Greenfield765 kV1,000 MW5.1 yrs60.2
PEAKSVIEWSubstation-Adjacent138 kV100 MW5.1 yrs59.0
MONELSubstation-Adjacent138 kV100 MW5.1 yrs59.0
BROOKVILLESubstation-Adjacent138 kV100 MW5.1 yrs58.3
SOUTH LYNCHBURGSubstation-Adjacent138 kV100 MW5.1 yrs58.3
OPOSSUM CREEKSubstation-Adjacent138 kV100 MW5.1 yrs58.3
GRAVES MILLSubstation-Adjacent138 kV100 MW5.1 yrs58.3
UNKNOWN121386Substation-Adjacent138 kV100 MW5.1 yrs58.3
REUSENSSubstation-Adjacent138 kV100 MW5.1 yrs58.3
FORESTSubstation-Adjacent138 kV100 MW5.1 yrs58.2
BRUSH TAVERNSubstation-Adjacent138 kV100 MW5.1 yrs58.2
NEW LONDONSubstation-Adjacent138 kV100 MW5.1 yrs58.2
IVY HILLSubstation-Adjacent138 kV100 MW5.1 yrs58.2
JOSHUA FALLSSubstation-Adjacent138 kV100 MW5.1 yrs58.2
GOMINGOSubstation-Adjacent138 kV100 MW5.1 yrs58.2
CANDLERS MOUNTAINSubstation-Adjacent138 kV100 MW5.1 yrs58.1
BOONSBOROSubstation-Adjacent138 kV100 MW5.1 yrs58.1
UNKNOWN114182Substation-Adjacent138 kV100 MW5.1 yrs58.0
SKIMMERSubstation-Adjacent115 kV100 MW5.1 yrs57.9
Former Lynchburg Foundry Company Storage BuildingIndustrial——5.1 yrs52.8
Commercial Warehouse PropertyIndustrial——5.1 yrs52.8
2501 Greene StShovel-Ready——5.1 yrs52.8
Dearington Tennis CourtsIndustrial——5.1 yrs52.8

Every scored site in Lynchburg city

All 58 sites, best first.

Lynchburg city datacenter FAQ

How many datacenter sites are in Lynchburg city?

58 scored datacenter candidate sites, averaging 54.7/100 DC Readiness. That is the 28th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Lynchburg city?

JOSHUA FALLS · 8aa51d0c scores 66.6/100 DC Readiness, the highest of the 58 scored sites in Lynchburg city (a substation-adjacent site).

Does Lynchburg city offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Lynchburg city?

FEMA's National Risk Index rates Lynchburg city as "Relatively Moderate" (score 30).

What are industrial electricity rates in Lynchburg city?

Average industrial electricity is 5.33¢/kWh and commercial is 7.67¢/kWh in Lynchburg city.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Lynchburg city, Virginia”, https://gridcensus.com/datacenter-sites/virginia/lynchburg-city (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Lynchburg city, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.