Datacenter Sites in Isle of Wight, Virginia

Isle of Wight has 22 scored datacenter candidate sites averaging 51.2/100 DC Readiness, with a catalogued aggregate of 1,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

22
Candidate sites
51.2/100
Avg DC Readiness
1,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in Isle of Wight

Site-selection context for Isle of Wight

Yessales_tax_exemption
Datacenter tax incentive
5.34¢/kWh
Commercial electricity
4.63¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,877
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in Isle of Wight

Top datacenter sites in Isle of Wight
SiteTypeVoltageCapacityQueue waitScore
SEPTASubstation-Adjacent500 kV1,000 MW3.8 yrs63.2
CHUCKATUCKSubstation-Adjacent230 kV300 MW3.8 yrs60.0
SMITHFIELDSubstation-Adjacent230 kV300 MW3.8 yrs59.7
WINDSOR DPSubstation-Adjacent115 kV100 MW3.8 yrs54.7
WAKEFIELDSubstation-Adjacent115 kV100 MW3.8 yrs53.9
St. Luke's Medical Office BuildingShovel-Ready——3.8 yrs49.8
Town Center at Benns GrantShovel-Ready——3.8 yrs49.8
20173 IWIP RoadShovel-Ready——3.8 yrs49.7
Brewers Neck Blvd. & Campbells Chapel DriveShovel-Ready——3.8 yrs49.6
10070 Old Stage Hwy.Shovel-Ready——3.8 yrs49.4
Tidewater Logistics Center - Building CShovel-Ready——3.8 yrs49.2
460 Commerce CenterShovel-Ready——3.8 yrs49.2
Tidewater Logistics Center - Building AShovel-Ready——3.8 yrs49.2
Tidewater Logistics Center - Building BShovel-Ready——3.8 yrs49.2
25400 Old Mill RoadShovel-Ready——3.8 yrs49.2
Shirley T. Holland Intermodal Park Phase IIIShovel-Ready——3.8 yrs49.1
Shirley T. Holland Intermodal Park - Phase IIShovel-Ready——3.8 yrs49.1
9584 Bear Trap CircleShovel-Ready——3.8 yrs49.0
Virginia Cold Dock 258Shovel-Ready——3.8 yrs48.9
Shelton PropertyShovel-Ready——3.8 yrs48.1
Mine SiteFormer Mine——3.8 yrs48.0
Franklin Industrial Air ParkShovel-Ready——3.8 yrs48.0

Isle of Wight datacenter FAQ

How many datacenter sites are in Isle of Wight?
22 scored datacenter candidate sites, averaging 51.2/100 DC Readiness.
Does Isle of Wight offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Isle of Wight?
FEMA's National Risk Index rates Isle of Wight as "Relatively Moderate" (score 30).
What are industrial electricity rates in Isle of Wight?
Average industrial electricity is 4.63¢/kWh and commercial is 5.34¢/kWh in Isle of Wight.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Isle of Wight, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.