Datacenter Sites in Isle of Wight, Virginia
Isle of Wight has 37 scored datacenter candidate sites averaging 58.1/100 DC Readiness, with a catalogued aggregate of 10,100 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
37
Candidate sites
58.1/100
Avg DC Readiness
10,100 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Isle of Wight
Yessales_tax_exemption
Datacenter tax incentive
5.34¢/kWh
Commercial electricity
4.63¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,877
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
By site type
Top datacenter sites in Isle of Wight
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SEPTA | Substation-Adjacent | 500 kV | 1,000 MW | 3.8 yrs | 60.3 |
| CHUCKATUCK | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 58.1 |
| SMITHFIELD | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 57.0 |
| WINDSOR DP | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 51.4 |
| St. Luke's Medical Office Building | Shovel-Ready | — | — | 3.8 yrs | 51.1 |
| Town Center at Benns Grant | Shovel-Ready | — | — | 3.8 yrs | 51.1 |
| 20173 IWIP Road | Shovel-Ready | — | — | 3.8 yrs | 51.0 |
| Brewers Neck Blvd. & Campbells Chapel Drive | Shovel-Ready | — | — | 3.8 yrs | 50.9 |
| 10070 Old Stage Hwy. | Shovel-Ready | — | — | 3.8 yrs | 50.7 |
| 460 Commerce Center | Shovel-Ready | — | — | 3.8 yrs | 50.5 |
| WAKEFIELD | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 50.5 |
| 25400 Old Mill Road | Shovel-Ready | — | — | 3.8 yrs | 50.5 |
| Tidewater Logistics Center - Building C | Shovel-Ready | — | — | 3.8 yrs | 50.5 |
| Tidewater Logistics Center - Building B | Shovel-Ready | — | — | 3.8 yrs | 50.5 |
| Shirley T. Holland Intermodal Park - Phase II | Shovel-Ready | — | — | 3.8 yrs | 50.4 |
| Shirley T. Holland Intermodal Park Phase III | Shovel-Ready | — | — | 3.8 yrs | 50.4 |
| Tidewater Logistics Center - Building A | Shovel-Ready | — | — | 3.8 yrs | 50.4 |
| 9584 Bear Trap Circle | Shovel-Ready | — | — | 3.8 yrs | 50.3 |
| Virginia Cold Dock 258 | Shovel-Ready | — | — | 3.8 yrs | 50.2 |
| Shelton Property | Shovel-Ready | — | — | 3.8 yrs | 49.4 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 49.3 |
| Franklin Industrial Air Park | Shovel-Ready | — | — | 3.8 yrs | 49.3 |
Isle of Wight datacenter FAQ
- How many datacenter sites are in Isle of Wight?
- 37 scored datacenter candidate sites, averaging 58.1/100 DC Readiness.
- Does Isle of Wight offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
- What is the natural-hazard risk in Isle of Wight?
- FEMA's National Risk Index rates Isle of Wight as "Relatively Moderate" (score 30).
- What are industrial electricity rates in Isle of Wight?
- Average industrial electricity is 4.63¢/kWh and commercial is 5.34¢/kWh in Isle of Wight.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Isle of Wight, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.