Caroline has 32 scored datacenter candidate sites averaging 51.5/100 DC Readiness, with a catalogued aggregate of 1,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Caroline, Virginia has 32 scored datacenter candidate sites averaging 51.5/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 54th of 122 Virginia counties by number of sites and 74th by average score. The top-scoring site is LADYSMITH at 63.8/100.

32
Candidate sites
51.5/100
Avg DC Readiness
1,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Caroline

Site-selection context for Caroline

Yessales_tax_exemption
Datacenter tax incentive
7.92¢/kWh
Commercial electricity
6.15¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$4,710
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Caroline compare with other counties in Virginia?

By number of scored sites, Caroline ranks 54th of the 122 Virginia counties with a county page, holding 0.5% of the state's 5,871 sites. Its average DC Readiness of 51.5/100 ranks 74th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1196th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.

What types of datacenter sites are in Caroline?

Shovel-Ready sites are the most common (22, 69% of the county's inventory), followed by substation-adjacent (6) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Caroline?

Industrial electricity averages 6.15¢/kWh and commercial 7.92¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $4,710 an acre.

By site type

Top datacenter sites in Caroline

Top datacenter sites in Caroline
SiteTypeVoltageCapacityQueue waitScore
LADYSMITHSubstation-Adjacent500 kV1,000 MW5.1 yrs63.8
LADYSMITH CTSubstation-Adjacent230 kV300 MW5.1 yrs59.5
ST JOHNS DPSubstation-Adjacent115 kV100 MW5.1 yrs55.7
UNKNOWN116473Substation-Adjacent115 kV100 MW5.1 yrs55.5
UNKNOWN116480Substation-Adjacent115 kV100 MW5.1 yrs55.5
TAP139189Substation-Adjacent115 kV100 MW5.1 yrs55.3
OZ CarolineGreenfield——5.1 yrs55.2
Carmel Church Station Super SiteShovel-Ready——5.1 yrs52.0
Thompson IndustrialShovel-Ready——5.1 yrs50.8
The Caroline County Center for Innovation and IndustryShovel-Ready——5.1 yrs50.7
Carmel Church Business CenterShovel-Ready——5.1 yrs50.4
Belmont Professional VillageShovel-Ready——5.1 yrs50.4
Martin Property, CCS EntranceShovel-Ready——5.1 yrs50.3
Airlee Industrial and Data Center SiteShovel-Ready——5.1 yrs50.2
Ruther Glen Commercial CenterShovel-Ready——5.1 yrs50.2
Smith PropertyShovel-Ready——5.1 yrs50.1
Burke DevelopmentShovel-Ready——5.1 yrs50.1
Good Earth SiteShovel-Ready——5.1 yrs50.1
Ronald Smith I-95 SiteShovel-Ready——5.1 yrs50.1
Mine SiteFormer Mine——5.1 yrs50.0
Hugh Jones - 12.96 AcresShovel-Ready——5.1 yrs49.9
Airlee-95 Industrial Park - Building AShovel-Ready——5.1 yrs49.8
Airlee-95 Industrial Park - Building BShovel-Ready——5.1 yrs49.7
Ladysmith Industrial ParkShovel-Ready——5.1 yrs49.7
Hamlet - 65-100 Acres at Ladysmith Road & Green RoadShovel-Ready——5.1 yrs49.7

Every scored site in Caroline

All 32 sites, best first.

Caroline datacenter FAQ

How many datacenter sites are in Caroline?

32 scored datacenter candidate sites, averaging 51.5/100 DC Readiness. That is the 54th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Caroline?

LADYSMITH scores 63.8/100 DC Readiness, the highest of the 32 scored sites in Caroline (a substation-adjacent site).

Does Caroline offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Caroline?

FEMA's National Risk Index rates Caroline as "Relatively Moderate" (score 30).

What are industrial electricity rates in Caroline?

Average industrial electricity is 6.15¢/kWh and commercial is 7.92¢/kWh in Caroline.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Caroline, Virginia”, https://gridcensus.com/datacenter-sites/virginia/caroline (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Caroline, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.