Datacenter Sites in BRISTOL (CITY), Virginia

BRISTOL (CITY) has 42 scored datacenter candidate sites averaging 54.7/100 DC Readiness, with a catalogued aggregate of 2,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

42
Candidate sites
54.7/100
Avg DC Readiness
2,300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in BRISTOL (CITY)

Site-selection context for BRISTOL (CITY)

Yessales_tax_exemption
Datacenter tax incentive
8.96¢/kWh
Commercial electricity
5.76¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in BRISTOL (CITY)

Top datacenter sites in BRISTOL (CITY)
SiteTypeVoltageCapacityQueue waitScore
Bristol Demolition LandfillBrownfield0 MW1.0 yrs68.8
HOLSTON DAMSubstation-Adjacent161 kV100 MW1.0 yrs60.8
OZ BristolGreenfield3.1 yrs60.4
UNKNOWN116720Substation-Adjacent69 kV50 MW1.0 yrs58.1
UNKNOWN170573Substation-Adjacent69 kV50 MW1.0 yrs58.1
TAP152879Substation-Adjacent69 kV50 MW1.0 yrs58.1
UNKNOWN113973Substation-Adjacent138 kV100 MW3.8 yrs54.4
NORTH BRISTOLSubstation-Adjacent138 kV100 MW3.8 yrs54.4
OZ BristolGreenfield3.1 yrs54.3
VIRGINIA WOODWORKING CO., INC. (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing3.5 yrs54.0
HOLSTON STEEL SERVICES, INC. (IRON AND STEEL MILLS)Manufacturing3.5 yrs54.0
ELECTRO-MECHANICAL CORP. (H Q) (POWER, DISTRIBUTION, AND SPECIALTY TRANSFORMER MANUFACTURING)Manufacturing3.5 yrs54.0
DOMINION CARTON CORP. (PAPERBOARD MILLS)Manufacturing3.5 yrs54.0
MALCOLM MEAT SERVICE, INC. (MEAT PROCESSED FROM CARCASSES)Manufacturing3.5 yrs54.0
BALL CORP. (METAL CAN MANUFACTURING)Manufacturing3.5 yrs54.0
FEDERAL PACIFIC TRANSFORMERS (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing3.5 yrs54.0
AMERICAN COMMERCIAL, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing3.5 yrs54.0
STRONGWELL CO. (MINERAL WOOL MANUFACTURING)Manufacturing3.5 yrs54.0
LINE POWER MANUFACTURING CORP. (MINING MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs54.0
BRISTOL HERALD COURIER (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs54.0
WILLIAMS CO., INC., THE (MACHINE SHOPS)Manufacturing3.5 yrs54.0
MAGIC WAND, INC. (OTHER COMMERCIAL AND SERVICE INDUSTRY MACHINERY MANUFACTURING)Manufacturing3.5 yrs54.0
BOLTS & SCREWS, INC. (BOLT, NUT, SCREW, RIVET, AND WASHER MANUFACTURING)Manufacturing3.5 yrs54.0
TRAV-A-LITE OF BRISTOL (CANVAS AND RELATED PRODUCT MILLS)Manufacturing3.5 yrs54.0
ELECTRIC MOTOR REPAIR & SALES (MOTOR AND GENERATOR MANUFACTURING)Manufacturing3.5 yrs54.0

BRISTOL (CITY) datacenter FAQ

How many datacenter sites are in BRISTOL (CITY)?
42 scored datacenter candidate sites, averaging 54.7/100 DC Readiness.
Does BRISTOL (CITY) offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in BRISTOL (CITY)?
FEMA's National Risk Index rates BRISTOL (CITY) as "Relatively Moderate" (score 30).
What are industrial electricity rates in BRISTOL (CITY)?
Average industrial electricity is 5.76¢/kWh and commercial is 8.96¢/kWh in BRISTOL (CITY).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BRISTOL (CITY), Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.