BRISTOL (CITY) has 43 scored datacenter candidate sites averaging 55.1/100 DC Readiness, with a catalogued aggregate of 450 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

BRISTOL (CITY), Virginia has 43 scored datacenter candidate sites averaging 55.1/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 42nd of 122 Virginia counties by number of sites and 27th by average score. The top-scoring site is Bristol Demolition Landfill at 64.3/100.

43
Candidate sites
55.1/100
Avg DC Readiness
450 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in BRISTOL (CITY)

Site-selection context for BRISTOL (CITY)

Yessales_tax_exemption
Datacenter tax incentive
8.96¢/kWh
Commercial electricity
5.76¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does BRISTOL (CITY) compare with other counties in Virginia?

By number of scored sites, BRISTOL (CITY) ranks 42nd of the 122 Virginia counties with a county page, holding 0.7% of the state's 5,871 sites. Its average DC Readiness of 55.1/100 ranks 27th in the state and is roughly in line with the national average of 53.0. Nationally it has the 887th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in BRISTOL (CITY)?

Manufacturing sites are the most common (20, 47% of the county's inventory), followed by shovel-ready (8) and industrial (6). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in BRISTOL (CITY)?

Industrial electricity averages 5.76¢/kWh and commercial 8.96¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,900 an acre.

By site type

Top datacenter sites in BRISTOL (CITY)

Top datacenter sites in BRISTOL (CITY)
SiteTypeVoltageCapacityQueue waitScore
Bristol Demolition LandfillBrownfield—0 MW5.1 yrs64.3
OZ BristolGreenfield——5.1 yrs62.4
UNKNOWN113973Substation-Adjacent138 kV100 MW5.1 yrs60.7
NORTH BRISTOLSubstation-Adjacent138 kV100 MW5.1 yrs60.6
OZ BristolGreenfield——5.1 yrs56.6
HOLSTON DAMSubstation-Adjacent161 kV100 MW4.7 yrs56.5
250 Commonwealth AvenueShovel-Ready——5.1 yrs54.4
LINE POWER MANUFACTURING CORP. (MINING MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing——5.1 yrs54.4
AMERICAN COMMERCIAL, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing——5.1 yrs54.4
SNACK ALLIANCE, INC. (OTHER SNACK FOOD MANUFACTURING)Manufacturing——5.1 yrs54.4
MALCOLM MEAT SERVICE, INC. (MEAT PROCESSED FROM CARCASSES)Manufacturing——5.1 yrs54.4
305 Piedmont AvenueIndustrial——5.1 yrs54.4
BRISTOL HERALD COURIER (OTHER COMMERCIAL PRINTING)Manufacturing——5.1 yrs54.4
INDUSTRIAL TOOL SERVICES, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——5.1 yrs54.4
HOLSTON STEEL SERVICES, INC. (IRON AND STEEL MILLS)Manufacturing——5.1 yrs54.4
250 CommonwealthShovel-Ready——5.1 yrs54.4
ELECTRO-MECHANICAL CORP. (H Q) (POWER, DISTRIBUTION, AND SPECIALTY TRANSFORMER MANUFACTURING)Manufacturing——5.1 yrs54.4
STRONGWELL CO. (MINERAL WOOL MANUFACTURING)Manufacturing——5.1 yrs54.4
VIRGINIA WOODWORKING CO., INC. (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing——5.1 yrs54.4
GORDON GARMENT CO. (OTHER APPAREL ACCESSORIES AND OTHER APPAREL MANUFACTURING)Manufacturing——5.1 yrs54.4
Beaver Creek RedevelopmentIndustrial——5.1 yrs54.4
309-317 Piedmont AvenueIndustrial——5.1 yrs54.4
Former Oak Street School SiteIndustrial——5.1 yrs54.4
DOMINION CARTON CORP. (PAPERBOARD MILLS)Manufacturing——5.1 yrs54.4
TRAV-A-LITE OF BRISTOL (CANVAS AND RELATED PRODUCT MILLS)Manufacturing——5.1 yrs54.4

Every scored site in BRISTOL (CITY)

All 43 sites, best first.

BRISTOL (CITY) datacenter FAQ

How many datacenter sites are in BRISTOL (CITY)?

43 scored datacenter candidate sites, averaging 55.1/100 DC Readiness. That is the 42nd-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in BRISTOL (CITY)?

Bristol Demolition Landfill scores 64.3/100 DC Readiness, the highest of the 43 scored sites in BRISTOL (CITY) (a brownfield site).

Does BRISTOL (CITY) offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in BRISTOL (CITY)?

FEMA's National Risk Index rates BRISTOL (CITY) as "Relatively Moderate" (score 30).

What are industrial electricity rates in BRISTOL (CITY)?

Average industrial electricity is 5.76¢/kWh and commercial is 8.96¢/kWh in BRISTOL (CITY).

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in BRISTOL (CITY), Virginia”, https://gridcensus.com/datacenter-sites/virginia/bristol-city (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for BRISTOL (CITY), Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.