AUGUSTA has 60 scored datacenter candidate sites averaging 50.2/100 DC Readiness, with a catalogued aggregate of 400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

AUGUSTA, Virginia has 60 scored datacenter candidate sites averaging 50.2/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 27th of 122 Virginia counties by number of sites and 100th by average score. The top-scoring site is WEST STAUNTON at 60.2/100.

60
Candidate sites
50.2/100
Avg DC Readiness
400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in AUGUSTA

Site-selection context for AUGUSTA

Yessales_tax_exemption
Datacenter tax incentive
7.41¢/kWh
Commercial electricity
5.88¢/kWh
Industrial electricity
12
Fiber providers
Low
Water stress
$7,594
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does AUGUSTA compare with other counties in Virginia?

By number of scored sites, AUGUSTA ranks 27th of the 122 Virginia counties with a county page, holding 1.0% of the state's 5,871 sites. Its average DC Readiness of 50.2/100 ranks 100th in the state and is roughly in line with the national average of 53.0. Nationally it has the 623rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.

What types of datacenter sites are in AUGUSTA?

Manufacturing sites are the most common (39, 65% of the county's inventory), followed by shovel-ready (18) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in AUGUSTA?

Industrial electricity averages 5.88¢/kWh and commercial 7.41¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 12 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $7,594 an acre.

By site type

Top datacenter sites in AUGUSTA

Top datacenter sites in AUGUSTA
SiteTypeVoltageCapacityQueue waitScore
WEST STAUNTONSubstation-Adjacent230 kV300 MW5.1 yrs60.2
Blue Mountain SiteShovel-Ready——5.1 yrs51.3
SHD Aviation Technology ParkShovel-Ready——5.1 yrs50.9
TYCO ELECTRONICS CORP. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——5.1 yrs50.9
FLINT GROUP (PRINTING INK MANUFACTURING)Manufacturing——5.1 yrs50.9
PACKAGING SERVICES, INC. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing——5.1 yrs50.9
ALCOA, INC., GROTTOES PLASTICS PLT. (PLASTICS PACKAGING FILM AND SHEET (INCLUDING LAMINATED) MANUFACTURING)Manufacturing——5.1 yrs50.9
SUNLITE PLASTICS, INC. (UNLAMINATED PLASTICS PROFILE SHAPE MANUFACTURING)Manufacturing——5.1 yrs50.8
DEGESCH AMERICA, INC. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING)Manufacturing——5.1 yrs50.8
CEMSI (INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS)Manufacturing——5.1 yrs50.8
HOUFF FEED & FERTILIZER, INC. (FERTILIZER (MIXING ONLY) MANUFACTURING)Manufacturing——5.1 yrs50.8
CERRO FABRICATED PRODUCTS, INC. (NONFERROUS FORGING)Manufacturing——5.1 yrs50.8
Mill Place Commerce ParkShovel-Ready——5.1 yrs50.6
Martin SiteShovel-Ready——5.1 yrs50.5
MEG SiteShovel-Ready——5.1 yrs50.3
Former Lineage BuildingShovel-Ready——5.1 yrs50.2
Turk Mountain PropertyShovel-Ready——5.1 yrs50.2
NEUMAN ALUMINUM U.S.A. (OTHER ALUMINUM ROLLING AND DRAWING)Manufacturing——5.1 yrs50.2
WAYNESBORO ALLOY WORKS, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——5.1 yrs50.2
EFCO CORP. (METAL WINDOW AND DOOR MANUFACTURING)Manufacturing——5.1 yrs50.2
MIDVALLEY PRESS (OTHER COMMERCIAL PRINTING)Manufacturing——5.1 yrs50.2
VALLEY PRECISION, INC. (SHEET METAL WORK MANUFACTURING)Manufacturing——5.1 yrs50.2
MCKEE FOODS CORP. (OTHER SNACK FOOD MANUFACTURING)Manufacturing——5.1 yrs50.1
HANSEN TRANSMISSIONS, INC. (NOT AVAILABLE)Manufacturing——5.1 yrs50.1
TAYLOR & BOODY ORGAN BUILDERS (MUSICAL INSTRUMENT MANUFACTURING)Manufacturing——5.1 yrs50.1

Every scored site in AUGUSTA

All 60 sites, best first.

AUGUSTA datacenter FAQ

How many datacenter sites are in AUGUSTA?

60 scored datacenter candidate sites, averaging 50.2/100 DC Readiness. That is the 27th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in AUGUSTA?

WEST STAUNTON scores 60.2/100 DC Readiness, the highest of the 60 scored sites in AUGUSTA (a substation-adjacent site).

Does AUGUSTA offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in AUGUSTA?

FEMA's National Risk Index rates AUGUSTA as "Relatively Moderate" (score 30).

What are industrial electricity rates in AUGUSTA?

Average industrial electricity is 5.88¢/kWh and commercial is 7.41¢/kWh in AUGUSTA.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in AUGUSTA, Virginia”, https://gridcensus.com/datacenter-sites/virginia/augusta (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for AUGUSTA, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.