Greenfield (STAUNTON - GOSHEN)
GreenfieldAUGUSTA, Ohio · PJM
At a glance
Greenfield (STAUNTON - GOSHEN) is a greenfield datacenter candidate site in AUGUSTA, Ohio, scoring 50.0/100 DC Readiness — 51st of 60 scored sites in the county. Its nearest substation is STAUNTON. It sits in the PJM grid region, where interconnection has averaged 5.2 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.
AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track Greenfield (STAUNTON - GOSHEN)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Greenfield (STAUNTON - GOSHEN) compare with other sites in AUGUSTA?
Greenfield (STAUNTON - GOSHEN) ranks 51st of 60 scored candidate sites in AUGUSTA. Its 50.0/100 is roughly in line with the county average of 50.7. It is roughly in line with the Ohio average of 54.8 and roughly in line with the national average of 53.2.
Against the Ohio average, its strongest sub-score is speed to power (50 vs 46) and its weakest is fiber connectivity (60 vs 72). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Greenfield (STAUNTON - GOSHEN) to power, fiber and other datacenters?
The nearest mapped substation, STAUNTON, is the closest grid connection point on record and operates at 115 kV. The nearest located transmission bottleneck is CHARLTSV-PROFITDP 2054B1 A 230 KV (PJM), 44 miles away. For connectivity, the nearest internet exchange facility is Equinix CU1/CU2/CU3/CU4 - Culpeper at 72.9 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DBT Data - Harrisonburg Center, 32.7 miles away.
What are the flood, water and hazard risks at Greenfield (STAUNTON - GOSHEN)?
At the county level, FEMA's National Risk Index rates AUGUSTA "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in AUGUSTA, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| WEST STAUNTON | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 60.7 |
| Blue Mountain Site | Shovel-Ready | — | — | 5.1 yrs | 51.7 |
| TYCO ELECTRONICS CORP. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 51.4 |
| ALCOA, INC., GROTTOES PLASTICS PLT. (PLASTICS PACKAGING FILM AND SHEET (INCLUDING LAMINATED) MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 51.4 |
| PACKAGING SERVICES, INC. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 51.4 |
| DEGESCH AMERICA, INC. (PESTICIDE AND OTHER AGRICULTURAL CHEMICAL MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 51.3 |
| FLINT GROUP (PRINTING INK MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 51.3 |
| SUNLITE PLASTICS, INC. (UNLAMINATED PLASTICS PROFILE SHAPE MANUFACTURING) | Manufacturing | — | — | 5.1 yrs | 51.3 |
Greenfield (STAUNTON - GOSHEN): common questions
What is the DC Readiness score of Greenfield (STAUNTON - GOSHEN)?
Greenfield (STAUNTON - GOSHEN) scores 50.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 51st of 60 scored sites in AUGUSTA. The AUGUSTA average is 50.7 and the Ohio average is 54.8.
What is the nearest substation to Greenfield (STAUNTON - GOSHEN)?
The nearest mapped substation is STAUNTON, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.
What grid region is Greenfield (STAUNTON - GOSHEN) in?
Greenfield (STAUNTON - GOSHEN) is in the PJM region. Projects interconnecting there have averaged a 5.2-year wait from queue request to operation.
How far is Greenfield (STAUNTON - GOSHEN) from an internet exchange?
The nearest internet exchange facility is Equinix CU1/CU2/CU3/CU4 - Culpeper, about 72.9 miles away; 12 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Greenfield (STAUNTON - GOSHEN), AUGUSTA, OH”, https://gridcensus.com/datacenter-sites/ohio/augusta/greenfield-staunton-goshen-689ac459 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Greenfield (STAUNTON - GOSHEN), AUGUSTA is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.