Datacenter Sites in Rogers, Oklahoma
Rogers has 54 scored datacenter candidate sites averaging 56.1/100 DC Readiness, with a catalogued aggregate of 2,950 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Rogers, Oklahoma has 54 scored datacenter candidate sites averaging 56.1/100 DC Readiness, roughly in line with the Oklahoma average of 52.8. It ranks 16th of 76 Oklahoma counties by number of sites and 8th by average score. The top-scoring site is NORTHEASTERN (345KV) at 66.5/100.
Site-selection context for Rogers
Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
How does Rogers compare with other counties in Oklahoma?
By number of scored sites, Rogers ranks 16th of the 76 Oklahoma counties with a county page, holding 1.5% of the state's 3,723 sites. Its average DC Readiness of 56.1/100 ranks 8th in the state and is roughly in line with the national average of 53.0. Nationally it has the 695th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 35 score 55 or higher.
What types of datacenter sites are in Rogers?
Substation-Adjacent sites are the most common (22, 41% of the county's inventory), followed by greenfield (16) and former mine (11). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Rogers?
Industrial electricity averages 8.32¢/kWh and commercial 10.94¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low-medium. 7 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $3,964 an acre.
By site type
Top datacenter sites in Rogers
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| NORTHEASTERN (345KV) | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 66.5 |
| EC Coal Rogers County | Greenfield | — | — | 4.3 yrs | 62.0 |
| EC Coal Rogers County | Greenfield | — | — | 4.3 yrs | 62.0 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 61.8 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 60.6 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 60.2 |
| EC Coal Rogers County | Greenfield | — | — | 4.3 yrs | 59.7 |
| UNKNOWN119698 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 59.3 |
| UNKNOWN119438 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 59.3 |
| UNKNOWN118387 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 59.2 |
| TAP149304 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 59.2 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 59.1 |
| UNKNOWN119379 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 58.8 |
| TAP148914 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 58.8 |
| TAP168568 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 58.7 |
| UNKNOWN168569 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 58.7 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 58.3 |
| TAP149291 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 58.2 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 58.1 |
| UNKNOWN119012 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 58.0 |
| Greenfield (ONETA - NORTHEASTERN (345KV)) | Greenfield | 345 kV | 600 MW | 4.3 yrs | 57.9 |
| OZ Rogers | Greenfield | — | — | 4.3 yrs | 57.6 |
| UNKNOWN119672 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 57.2 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 57.1 |
| EC Near Northeastern | Greenfield | — | — | 4.3 yrs | 57.1 |
Every scored site in Rogers
All 54 sites, best first.
- NORTHEASTERN (345KV) · 66.5
- EC Coal Rogers County · 8ff45834 · 62.0
- EC Coal Rogers County · 2d6bd95b · 62.0
- EC Near Northeastern · c4052885 · 61.8
- EC Near Northeastern · 3d095c75 · 60.6
- EC Near Northeastern · c7e36762 · 60.2
- EC Coal Rogers County · 1b64b50f · 59.7
- Substation-Adjacent site · cc861a3b · 59.3
- Substation-Adjacent site · 9eb487b3 · 59.3
- Substation-Adjacent site · 6542476c · 59.2
- Substation-Adjacent site · e9e0c6bc · 59.2
- EC Near Northeastern · 30243a61 · 59.1
- Substation-Adjacent site · e119d52e · 58.8
- Substation-Adjacent site · d3342510 · 58.8
- Substation-Adjacent site · 07224989 · 58.7
- Substation-Adjacent site · eabc69ba · 58.7
- EC Near Northeastern · 10c99d95 · 58.3
- Substation-Adjacent site · 985f2605 · 58.2
- EC Near Northeastern · c767fc7c · 58.1
- Substation-Adjacent site · 191f554f · 58.0
- Greenfield (ONETA - NORTHEASTERN (345KV)) · 57.9
- OZ Rogers · 57.6
- Substation-Adjacent site · 0d78439e · 57.2
- EC Near Northeastern · 2a913f70 · 57.1
- EC Near Northeastern · 82dbf6cc · 57.1
- Substation-Adjacent site · 1a77187f · 56.5
- Substation-Adjacent site · c31bdf2a · 56.4
- Substation-Adjacent site · 285e5901 · 56.3
- EC Coal Rogers County · 72dc841c · 56.0
- Substation-Adjacent site · 10a59884 · 56.0
- Substation-Adjacent site · 4128a626 · 55.5
- Substation-Adjacent site · 739a3adb · 55.4
- Substation-Adjacent site · 2de8679b · 55.3
- Substation-Adjacent site · ba460632 · 55.3
- Substation-Adjacent site · f7fb36c4 · 55.3
- EC Near Northeastern · b3e9d0a3 · 54.9
- EC Near Northeastern · 05fb8c90 · 54.6
- Substation-Adjacent site · 1c57634d · 54.2
- Mine Site · 3b01b28c · 53.5
- CATOOSA, OK · b1811c4e · 53.5
- Mine Site · 0f06b18e · 53.3
- Mine Site · 19f02e8b · 51.9
- Collinsville- Strip Coal Mine · 51.8
- Mine Site · bcead918 · 51.6
- Claremore Federal Building · 0e652b56 · 51.4
- Mine Site · b214da4f · 51.1
- NWS RDA TULSA OK SITE INSTALLATION · aefb3538 · 51.0
- Mine Site · d98ded8b · 51.0
- Mine Site · 5597bfb4 · 50.9
- Mine Site · 14377ede · 50.9
- Claremore Federal Building · 493d045e · 50.7
- Mine Site · f4d11861 · 50.7
- Mine Site · d640f794 · 49.8
- Mine Site · dde4cce9 · 49.8
Rogers datacenter FAQ
How many datacenter sites are in Rogers?
54 scored datacenter candidate sites, averaging 56.1/100 DC Readiness. That is the 16th-most of 76 Oklahoma counties with five or more sites.
What is the highest-scoring datacenter site in Rogers?
NORTHEASTERN (345KV) scores 66.5/100 DC Readiness, the highest of the 54 scored sites in Rogers (a substation-adjacent site).
Does Rogers offer datacenter tax incentives?
Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
What is the natural-hazard risk in Rogers?
FEMA's National Risk Index rates Rogers as "Relatively High" (score 42).
What are industrial electricity rates in Rogers?
Average industrial electricity is 8.32¢/kWh and commercial is 10.94¢/kWh in Rogers.
More in Oklahoma
- All datacenter sites in Oklahoma· 3,723 sites
- Operating datacenters in Oklahoma
- Electric substations in Oklahoma
- Oklahoma County· 375 sites · avg 55.7
- Jackson County· 230 sites · avg 49.4
- Tulsa County· 213 sites · avg 57.9
- Cleveland County· 195 sites · avg 52.6
- Kiowa County· 171 sites · avg 48.9
- Atoka County· 130 sites · avg 48.1
- Substation-Adjacent sites in Oklahoma
- Greenfield sites in Oklahoma
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Rogers, Oklahoma”, https://gridcensus.com/datacenter-sites/oklahoma/rogers (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Rogers, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.