Skip to content
Gridcensus

Datacenter Sites in Rogers, Oklahoma

Rogers has 54 scored datacenter candidate sites averaging 56.1/100 DC Readiness, with a catalogued aggregate of 2,950 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Rogers, Oklahoma has 54 scored datacenter candidate sites averaging 56.1/100 DC Readiness, roughly in line with the Oklahoma average of 52.8. It ranks 16th of 76 Oklahoma counties by number of sites and 8th by average score. The top-scoring site is NORTHEASTERN (345KV) at 66.5/100.

54
Candidate sites
56.1/100
Avg DC Readiness
2,950 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Rogers

Site-selection context for Rogers

Yessales_tax_exemption
Datacenter tax incentive
10.94¢/kWh
Commercial electricity
8.32¢/kWh
Industrial electricity
7
Fiber providers
Low-Medium
Water stress
$3,964
Land price / acre
1,900
Cooling degree days
3,600
Heating degree days
60°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

How does Rogers compare with other counties in Oklahoma?

By number of scored sites, Rogers ranks 16th of the 76 Oklahoma counties with a county page, holding 1.5% of the state's 3,723 sites. Its average DC Readiness of 56.1/100 ranks 8th in the state and is roughly in line with the national average of 53.0. Nationally it has the 695th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 35 score 55 or higher.

What types of datacenter sites are in Rogers?

Substation-Adjacent sites are the most common (22, 41% of the county's inventory), followed by greenfield (16) and former mine (11). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Rogers?

Industrial electricity averages 8.32¢/kWh and commercial 10.94¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low-medium. 7 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $3,964 an acre.

By site type

Top datacenter sites in Rogers

Top datacenter sites in Rogers
SiteTypeVoltageCapacityQueue waitScore
NORTHEASTERN (345KV)Substation-Adjacent345 kV600 MW4.3 yrs66.5
EC Coal Rogers CountyGreenfield——4.3 yrs62.0
EC Coal Rogers CountyGreenfield——4.3 yrs62.0
EC Near NortheasternGreenfield——4.3 yrs61.8
EC Near NortheasternGreenfield——4.3 yrs60.6
EC Near NortheasternGreenfield——4.3 yrs60.2
EC Coal Rogers CountyGreenfield——4.3 yrs59.7
UNKNOWN119698Substation-Adjacent138 kV100 MW4.3 yrs59.3
UNKNOWN119438Substation-Adjacent161 kV100 MW4.3 yrs59.3
UNKNOWN118387Substation-Adjacent161 kV100 MW4.3 yrs59.2
TAP149304Substation-Adjacent138 kV100 MW4.3 yrs59.2
EC Near NortheasternGreenfield——4.3 yrs59.1
UNKNOWN119379Substation-Adjacent161 kV100 MW4.3 yrs58.8
TAP148914Substation-Adjacent138 kV100 MW4.3 yrs58.8
TAP168568Substation-Adjacent138 kV100 MW4.3 yrs58.7
UNKNOWN168569Substation-Adjacent138 kV100 MW4.3 yrs58.7
EC Near NortheasternGreenfield——4.3 yrs58.3
TAP149291Substation-Adjacent138 kV100 MW4.3 yrs58.2
EC Near NortheasternGreenfield——4.3 yrs58.1
UNKNOWN119012Substation-Adjacent161 kV100 MW4.3 yrs58.0
Greenfield (ONETA - NORTHEASTERN (345KV))Greenfield345 kV600 MW4.3 yrs57.9
OZ RogersGreenfield——4.3 yrs57.6
UNKNOWN119672Substation-Adjacent138 kV100 MW4.3 yrs57.2
EC Near NortheasternGreenfield——4.3 yrs57.1
EC Near NortheasternGreenfield——4.3 yrs57.1

Every scored site in Rogers

All 54 sites, best first.

Rogers datacenter FAQ

How many datacenter sites are in Rogers?

54 scored datacenter candidate sites, averaging 56.1/100 DC Readiness. That is the 16th-most of 76 Oklahoma counties with five or more sites.

What is the highest-scoring datacenter site in Rogers?

NORTHEASTERN (345KV) scores 66.5/100 DC Readiness, the highest of the 54 scored sites in Rogers (a substation-adjacent site).

Does Rogers offer datacenter tax incentives?

Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

What is the natural-hazard risk in Rogers?

FEMA's National Risk Index rates Rogers as "Relatively High" (score 42).

What are industrial electricity rates in Rogers?

Average industrial electricity is 8.32¢/kWh and commercial is 10.94¢/kWh in Rogers.

More in Oklahoma

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Rogers, Oklahoma”, https://gridcensus.com/datacenter-sites/oklahoma/rogers (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Rogers, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.