Skip to content
Gridcensus

EC Near Northeastern

Greenfield

Rogers, Oklahoma · SPP

DC Readiness
54.7
Fair / 100

At a glance

EC Near Northeastern is a greenfield datacenter candidate site in Rogers, Oklahoma, scoring 54.7/100 DC Readiness — 37th of 54 scored sites in the county. It sits in the SPP grid region and the PUBLIC SERVICE CO OF OKLAHOMA service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Nearest grid bottleneckTMP270_23432 · 78 km (SPP)
LMP zoneSPP_SOUTH
Wholesale LMP$15.62/MWh
Utility commercial rate0.11¢/kWh
UtilityPUBLIC SERVICE CO OF OKLAHOMAinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth108
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPTulsaConnect DC3
IXP distance30.0 mi
Fiber providers7
Fiber coverage51.4%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance265.4 mi

Site characteristics

Site typeGreenfield
Land contactRogers County Assessor
Land owner typeprivate
Buildability25.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone A (SFHA)
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score43/100
Construction cost index82.2 (avg 100)

Location context

Nearest datacenterGoogle Pryor
DC distance21.4 mi
Nearest rail4.5 mi
Nearest gas pipeline6.9 mi
Nearest fiber route34.9 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.94¢/kWh
Industrial electricity8.32¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$3,964

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Northeastern

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Northeastern compare with other sites in Rogers?

EC Near Northeastern ranks 37th of 54 scored candidate sites in Rogers. Its 54.7/100 is roughly in line with the county average of 56.2. It is roughly in line with the Oklahoma average of 52.9 and roughly in line with the national average of 53.2.

Against the Oklahoma average, its strongest sub-score is water (69 vs 64) and its weakest is natural hazard (43 vs 57). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Northeastern to power, fiber and other datacenters?

The nearest located transmission bottleneck is TMP270_23432 (SPP), 48 miles away. For connectivity, the nearest internet exchange facility is TulsaConnect DC3 at 30 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Google Pryor, 21.4 miles away.

What are the flood, water and hazard risks at EC Near Northeastern?

The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. WRI rates baseline water stress at 1.80 on a 0–5 scale. No mapped wetlands are recorded on the parcel. At the county level, FEMA's National Risk Index rates Rogers "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
65
Energy cost10%
93
Water risk7%
69
Natural hazard6%
43
Buildability7%
25
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
82
Gas pipeline2%
78
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Rogers, ranked by DC Readiness.

Sites near EC Near Northeastern
SiteTypeVoltageCapacityQueue waitScore
NORTHEASTERN (345KV)Substation-Adjacent345 kV600 MW4.3 yrs66.5
EC Coal Rogers CountyGreenfield——4.3 yrs62.1
EC Coal Rogers CountyGreenfield——4.3 yrs62.1
EC Near NortheasternGreenfield——4.3 yrs61.9
EC Near NortheasternGreenfield——4.3 yrs60.7
EC Near NortheasternGreenfield——4.3 yrs60.3
EC Coal Rogers CountyGreenfield——4.3 yrs59.8
UNKNOWN119438Substation-Adjacent161 kV100 MW4.3 yrs59.4

EC Near Northeastern: common questions

What is the DC Readiness score of EC Near Northeastern?

EC Near Northeastern scores 54.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 37th of 54 scored sites in Rogers. The Rogers average is 56.2 and the Oklahoma average is 52.9.

Which electric utility serves EC Near Northeastern?

PUBLIC SERVICE CO OF OKLAHOMA (investor owned) holds the retail service territory that contains the site; its holding company is AMERICAN ELECTRIC POWER CO.

What grid region is EC Near Northeastern in?

EC Near Northeastern is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Near Northeastern in a flood zone?

The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

Who owns EC Near Northeastern?

Parcel records list the owner as PUBLIC SERVICE CO OF OKLAHOMA (private land).

How far is EC Near Northeastern from an internet exchange?

The nearest internet exchange facility is TulsaConnect DC3, about 30 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Northeastern, Rogers, OK”, https://gridcensus.com/datacenter-sites/oklahoma/rogers/ec-near-northeastern-05fb8c90 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Northeastern, Rogers is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.