Datacenter Sites in Noble, Oklahoma
Noble has 27 scored datacenter candidate sites averaging 55.6/100 DC Readiness, with a catalogued aggregate of 2,650 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Noble, Oklahoma has 27 scored datacenter candidate sites averaging 55.6/100 DC Readiness, roughly in line with the Oklahoma average of 52.8. It ranks 40th of 76 Oklahoma counties by number of sites and 11th by average score. The top-scoring site is SOONER at 64.9/100.
Site-selection context for Noble
Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
How does Noble compare with other counties in Oklahoma?
By number of scored sites, Noble ranks 40th of the 76 Oklahoma counties with a county page, holding 0.7% of the state's 3,723 sites. Its average DC Readiness of 55.6/100 ranks 11th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1383rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 19 score 55 or higher.
What types of datacenter sites are in Noble?
Substation-Adjacent sites are the most common (15, 56% of the county's inventory), followed by greenfield (9) and industrial (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Noble?
Industrial electricity averages 7.53¢/kWh and commercial 10.32¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (42). WRI water stress is low-medium. 7 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $2,423 an acre.
By site type
Top datacenter sites in Noble
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SOONER | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 64.9 |
| EC Near Sooner | Greenfield | — | — | 4.3 yrs | 59.0 |
| EC Near Sooner | Greenfield | — | — | 4.3 yrs | 59.0 |
| EC Near Sooner | Greenfield | — | — | 4.3 yrs | 58.9 |
| EC Near Sooner | Greenfield | — | — | 4.3 yrs | 58.9 |
| EC Near Sooner | Greenfield | — | — | 4.3 yrs | 58.0 |
| EC Near Sooner | Greenfield | — | — | 4.3 yrs | 56.6 |
| EC Near Sooner | Greenfield | — | — | 4.3 yrs | 56.3 |
| UNKNOWN119315 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 56.2 |
| UNKNOWN168497 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 56.2 |
| UNKNOWN119317 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 56.1 |
| UNKNOWN119316 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 56.1 |
| UNKNOWN120007 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 56.1 |
| TAP148976 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 56.1 |
| TAP148967 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 55.5 |
| UNKNOWN119313 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 55.5 |
| TAP148968 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 55.5 |
| UNKNOWN119312 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 55.4 |
| Greenfield (CHARLES D. LAMB ENERGY CENTER ) | Greenfield | 345 kV | 600 MW | 4.3 yrs | 55.0 |
| TAP148972 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 54.6 |
| UNKNOWN118335 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 54.2 |
| TAP148971 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 54.2 |
| UNKNOWN119392 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.3 |
| Perry Armory | Industrial | — | — | 4.3 yrs | 49.9 |
| Greenfield (UNKNOWN118369 - TAP148976) | Greenfield | 138 kV | 100 MW | 4.3 yrs | 49.9 |
Every scored site in Noble
All 27 sites, best first.
- SOONER · 64.9
- EC Near Sooner · 39df7c57 · 59.0
- EC Near Sooner · be85f8fc · 59.0
- EC Near Sooner · 57b8406a · 58.9
- EC Near Sooner · 830bf816 · 58.9
- EC Near Sooner · 019b246e · 58.0
- EC Near Sooner · ad208d97 · 56.6
- EC Near Sooner · f5154286 · 56.3
- Substation-Adjacent site · ea0c143e · 56.2
- Substation-Adjacent site · 36378193 · 56.2
- Substation-Adjacent site · 96302be3 · 56.1
- Substation-Adjacent site · f9d3ca1f · 56.1
- Substation-Adjacent site · 4340dd8d · 56.1
- Substation-Adjacent site · bce2f3f8 · 56.1
- Substation-Adjacent site · 31ac06cd · 55.5
- Substation-Adjacent site · 20c7ed77 · 55.5
- Substation-Adjacent site · 4c00ea16 · 55.5
- Substation-Adjacent site · f909022b · 55.4
- Greenfield (CHARLES D. LAMB ENERGY CENTER ) · 55.0
- Substation-Adjacent site · 04e864ac · 54.6
- Substation-Adjacent site · 4431a8ee · 54.2
- Substation-Adjacent site · 08322c27 · 54.2
- Substation-Adjacent site · e4383cb5 · 53.3
- Perry Armory · 49.9
- Greenfield (UNKNOWN118369 - TAP148976) · 49.9
- Mine Site · 17883494 · 49.8
- Blackwell Industrial Authority · 49.1
Noble datacenter FAQ
How many datacenter sites are in Noble?
27 scored datacenter candidate sites, averaging 55.6/100 DC Readiness. That is the 40th-most of 76 Oklahoma counties with five or more sites.
What is the highest-scoring datacenter site in Noble?
SOONER scores 64.9/100 DC Readiness, the highest of the 27 scored sites in Noble (a substation-adjacent site).
Does Noble offer datacenter tax incentives?
Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
What is the natural-hazard risk in Noble?
FEMA's National Risk Index rates Noble as "Relatively High" (score 42).
What are industrial electricity rates in Noble?
Average industrial electricity is 7.53¢/kWh and commercial is 10.32¢/kWh in Noble.
More in Oklahoma
- All datacenter sites in Oklahoma· 3,723 sites
- Operating datacenters in Oklahoma
- Electric substations in Oklahoma
- Oklahoma County· 375 sites · avg 55.7
- Jackson County· 230 sites · avg 49.4
- Tulsa County· 213 sites · avg 57.9
- Cleveland County· 195 sites · avg 52.6
- Kiowa County· 171 sites · avg 48.9
- Atoka County· 130 sites · avg 48.1
- Substation-Adjacent sites in Oklahoma
- Greenfield sites in Oklahoma
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Noble, Oklahoma”, https://gridcensus.com/datacenter-sites/oklahoma/noble (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Noble, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.