Datacenter Sites in Noble, Oklahoma
Noble has 39 scored datacenter candidate sites averaging 60.7/100 DC Readiness, with a catalogued aggregate of 7,900 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
39
Candidate sites
60.7/100
Avg DC Readiness
7,900 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for Noble
Yessales_tax_exemption
Datacenter tax incentive
10.32¢/kWh
Commercial electricity
7.53¢/kWh
Industrial electricity
7
Fiber providers
Low-Medium
Water stress
$2,423
Land price / acre
1,900
Cooling degree days
3,600
Heating degree days
60°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
By site type
Top datacenter sites in Noble
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SOONER | Substation-Adjacent | 345 kV | 600 MW | 3.3 yrs | 59.9 |
| EC Near Sooner | Greenfield | — | — | 3.5 yrs | 58.7 |
| EC Near Sooner | Greenfield | — | — | 3.5 yrs | 58.7 |
| EC Near Sooner | Greenfield | — | — | 3.5 yrs | 58.7 |
| EC Near Sooner | Greenfield | — | — | 3.5 yrs | 58.4 |
| EC Near Sooner | Greenfield | — | — | 3.5 yrs | 57.8 |
| EC Near Sooner | Greenfield | — | — | 3.5 yrs | 56.2 |
| EC Near Sooner | Greenfield | — | — | 3.5 yrs | 55.8 |
| UNKNOWN120007 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.9 |
| UNKNOWN168497 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.9 |
| TAP148976 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.9 |
| UNKNOWN119315 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.9 |
| UNKNOWN119317 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.9 |
| UNKNOWN119316 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.9 |
| TAP148972 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.1 |
| TAP148971 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.1 |
| UNKNOWN119313 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.1 |
| TAP148967 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.1 |
| UNKNOWN118335 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.1 |
| UNKNOWN119312 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.1 |
| TAP148968 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 51.1 |
| Greenfield (CHARLES D. LAMB ENERGY CENTER ) | Greenfield | 345 kV | 600 MW | 3.3 yrs | 50.7 |
| UNKNOWN119392 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 49.5 |
| Perry Armory | Industrial | — | — | 3.3 yrs | 49.5 |
| Mine Site | Former Mine | — | — | 3.3 yrs | 49.4 |
Noble datacenter FAQ
- How many datacenter sites are in Noble?
- 39 scored datacenter candidate sites, averaging 60.7/100 DC Readiness.
- Does Noble offer datacenter tax incentives?
- Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
- What is the natural-hazard risk in Noble?
- FEMA's National Risk Index rates Noble as "Relatively High" (score 42).
- What are industrial electricity rates in Noble?
- Average industrial electricity is 7.53¢/kWh and commercial is 10.32¢/kWh in Noble.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Noble, Oklahoma. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.