Noble, Oklahoma · SPP

DC Readiness
54.2
Fair / 100

TAP148971 is a substation-adjacent datacenter candidate site in Noble, Oklahoma, interconnecting through SPP. It screens at 54.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP148971
Nearest grid bottleneckTMP270_23432 · 87 km (SPP)
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityOKLAHOMA GAS & ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.3 yrs

Connectivity

Nearest IXPMidcon Recovery Solutions B3 Data Center
IXP distance63.3 mi
Fiber providers7
Fiber coverage65.9%

Site characteristics

Land contactNoble County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterMidcon Recovery Solutions B3 Data Center
DC distance63.3 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.32¢/kWh
Industrial electricity7.53¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,423

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP148971

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
56
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Noble, ranked by DC Readiness.

Sites near TAP148971
SiteTypeVoltageCapacityQueue waitScore
SOONERSubstation-Adjacent345 kV600 MW3.3 yrs64.9
EC Near SoonerGreenfield——3.5 yrs59.5
EC Near SoonerGreenfield——3.5 yrs59.5
EC Near SoonerGreenfield——3.5 yrs59.4
EC Near SoonerGreenfield——3.5 yrs59.4
EC Near SoonerGreenfield——3.5 yrs58.5
EC Near SoonerGreenfield——3.5 yrs57.1
EC Near SoonerGreenfield——3.5 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.