Greenfield (CHARLES D. LAMB ENERGY CENTER )

Greenfield

Noble, Oklahoma · SPP

DC Readiness
50.7
Fair / 100

Greenfield (CHARLES D. LAMB ENERGY CENTER ) is a greenfield datacenter candidate site in Noble, Oklahoma, interconnecting through SPP. It screens at 50.7/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCHARLES D. LAMB ENERGY CENTER
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionSPP
Queue depth18
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLumen Tulsa 1
IXP distance63.5 mi
Fiber providers7
Fiber coverage65.9%

Site characteristics

Site typeGreenfield

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score58/100

Location context

Nearest datacenterOneNet OSU Tulsa
DC distance63.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.32¢/kWh
Industrial electricity7.53¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,423

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
51
Fiber connectivity12%
36
Energy cost10%
50
Water risk8%
64
Natural hazard8%
58
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Noble, ranked by DC Readiness.

Sites near Greenfield (CHARLES D. LAMB ENERGY CENTER )
SiteTypeVoltageCapacityQueue waitScore
SOONERSubstation-Adjacent345 kV600 MW3.3 yrs59.9
EC Near SoonerGreenfield3.5 yrs58.7
EC Near SoonerGreenfield3.5 yrs58.7
EC Near SoonerGreenfield3.5 yrs58.7
EC Near SoonerGreenfield3.5 yrs58.4
EC Near SoonerGreenfield3.5 yrs57.8
EC Near SoonerGreenfield3.5 yrs56.2
EC Near SoonerGreenfield3.5 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (CHARLES D. LAMB ENERGY CENTER ), Noble. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.