Datacenter Sites in Stoddard, Missouri
Stoddard has 27 scored datacenter candidate sites averaging 54.7/100 DC Readiness, with a catalogued aggregate of 1,350 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Stoddard, Missouri has 27 scored datacenter candidate sites averaging 54.7/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 23rd of 110 Missouri counties by number of sites and 50th by average score. The top-scoring site is Substation-Adjacent site · 4f50acae at 62.6/100.
Site-selection context for Stoddard
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
How does Stoddard compare with other counties in Missouri?
By number of scored sites, Stoddard ranks 23rd of the 110 Missouri counties with a county page, holding 0.8% of the state's 3,413 sites. Its average DC Readiness of 54.7/100 ranks 50th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1383rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.
What types of datacenter sites are in Stoddard?
Substation-Adjacent sites are the most common (13, 48% of the county's inventory), followed by greenfield (11) and former mine (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Stoddard?
Industrial electricity averages 7.73¢/kWh and commercial 12.89¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $6,814 an acre.
By site type
Top datacenter sites in Stoddard
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP153821 | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 62.6 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 57.5 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 57.4 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 57.4 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 56.6 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 56.5 |
| UNKNOWN117882 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 56.3 |
| UNKNOWN117766 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 56.1 |
| UNKNOWN117931 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 56.1 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 55.9 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 55.6 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 55.1 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 55.1 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 54.9 |
| UNKNOWN168435 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 54.4 |
| UNKNOWN168414 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 54.2 |
| UNKNOWN168421 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.6 |
| UNKNOWN168438 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.5 |
| UNKNOWN168431 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.5 |
| EC Near Essex | Greenfield | — | — | 4.3 yrs | 53.4 |
| TAP168424 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.3 |
| UNKNOWN168434 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.2 |
| UNKNOWN168432 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.2 |
| TAP168433 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 52.9 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 49.6 |
Every scored site in Stoddard
All 27 sites, best first.
- Substation-Adjacent site · 4f50acae · 62.6
- EC Near Essex · 59e0e560 · 57.5
- EC Near Essex · fbeadd38 · 57.4
- EC Near Essex · 7e7c67c1 · 57.4
- EC Near Essex · 460abd87 · 56.6
- EC Near Essex · 158f40fd · 56.5
- Substation-Adjacent site · 3937e8cb · 56.3
- Substation-Adjacent site · 32a59be4 · 56.1
- Substation-Adjacent site · a90d7606 · 56.1
- EC Near Essex · 7ab77e9b · 55.9
- EC Near Essex · 44f1edf3 · 55.6
- EC Near Essex · 5a42d11a · 55.1
- EC Near Essex · f18b3143 · 55.1
- EC Near Essex · bf7bc641 · 54.9
- Substation-Adjacent site · 69931452 · 54.4
- Substation-Adjacent site · 3bcfab6f · 54.2
- Substation-Adjacent site · dc38ebc0 · 53.6
- Substation-Adjacent site · 27a5a784 · 53.5
- Substation-Adjacent site · 5e335401 · 53.5
- EC Near Essex · c94d1297 · 53.4
- Substation-Adjacent site · 81e08d04 · 53.3
- Substation-Adjacent site · ebb0c944 · 53.2
- Substation-Adjacent site · 37e57055 · 53.2
- Substation-Adjacent site · 85b517a4 · 52.9
- Mine Site · 7a15f500 · 49.6
- Mine Site · 1bb53656 · 49.5
- Jonesboro · f559fb96 · 49.2
Stoddard datacenter FAQ
How many datacenter sites are in Stoddard?
27 scored datacenter candidate sites, averaging 54.7/100 DC Readiness. That is the 23rd-most of 110 Missouri counties with five or more sites.
What is the highest-scoring datacenter site in Stoddard?
Substation-Adjacent site · 4f50acae scores 62.6/100 DC Readiness, the highest of the 27 scored sites in Stoddard (a substation-adjacent site).
Does Stoddard offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Stoddard?
FEMA's National Risk Index rates Stoddard as "Relatively High" (score 38).
What are industrial electricity rates in Stoddard?
Average industrial electricity is 7.73¢/kWh and commercial is 12.89¢/kWh in Stoddard.
More in Missouri
- All datacenter sites in Missouri· 3,413 sites
- Operating datacenters in Missouri
- Electric substations in Missouri
- Jackson County· 422 sites · avg 58.5
- St. Louis County· 374 sites · avg 56.2
- St. Louis County· 363 sites · avg 55.7
- Greene County· 273 sites · avg 57.8
- Henry· 60 sites · avg 54.6
- Jasper County· 50 sites · avg 55.4
- Substation-Adjacent sites in Missouri
- Greenfield sites in Missouri
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Stoddard, Missouri”, https://gridcensus.com/datacenter-sites/missouri/stoddard (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Stoddard, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.