Datacenter Sites in Stoddard, Missouri

Stoddard has 27 scored datacenter candidate sites averaging 54.7/100 DC Readiness, with a catalogued aggregate of 1,350 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Stoddard, Missouri has 27 scored datacenter candidate sites averaging 54.7/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 23rd of 110 Missouri counties by number of sites and 50th by average score. The top-scoring site is Substation-Adjacent site · 4f50acae at 62.6/100.

27
Candidate sites
54.7/100
Avg DC Readiness
1,350 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Stoddard

Site-selection context for Stoddard

Yessales_tax_exemption
Datacenter tax incentive
12.89¢/kWh
Commercial electricity
7.73¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$6,814
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

How does Stoddard compare with other counties in Missouri?

By number of scored sites, Stoddard ranks 23rd of the 110 Missouri counties with a county page, holding 0.8% of the state's 3,413 sites. Its average DC Readiness of 54.7/100 ranks 50th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1383rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.

What types of datacenter sites are in Stoddard?

Substation-Adjacent sites are the most common (13, 48% of the county's inventory), followed by greenfield (11) and former mine (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Stoddard?

Industrial electricity averages 7.73¢/kWh and commercial 12.89¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $6,814 an acre.

By site type

Top datacenter sites in Stoddard

Top datacenter sites in Stoddard
SiteTypeVoltageCapacityQueue waitScore
TAP153821Substation-Adjacent345 kV600 MW4.3 yrs62.6
EC Near EssexGreenfield——4.3 yrs57.5
EC Near EssexGreenfield——4.3 yrs57.4
EC Near EssexGreenfield——4.3 yrs57.4
EC Near EssexGreenfield——4.3 yrs56.6
EC Near EssexGreenfield——4.3 yrs56.5
UNKNOWN117882Substation-Adjacent161 kV100 MW4.3 yrs56.3
UNKNOWN117766Substation-Adjacent161 kV100 MW4.3 yrs56.1
UNKNOWN117931Substation-Adjacent161 kV100 MW4.3 yrs56.1
EC Near EssexGreenfield——4.3 yrs55.9
EC Near EssexGreenfield——4.3 yrs55.6
EC Near EssexGreenfield——4.3 yrs55.1
EC Near EssexGreenfield——4.3 yrs55.1
EC Near EssexGreenfield——4.3 yrs54.9
UNKNOWN168435Substation-Adjacent69 kV50 MW3.9 yrs54.4
UNKNOWN168414Substation-Adjacent69 kV50 MW4.3 yrs54.2
UNKNOWN168421Substation-Adjacent69 kV50 MW4.3 yrs53.6
UNKNOWN168438Substation-Adjacent69 kV50 MW4.3 yrs53.5
UNKNOWN168431Substation-Adjacent69 kV50 MW4.3 yrs53.5
EC Near EssexGreenfield——4.3 yrs53.4
TAP168424Substation-Adjacent69 kV50 MW4.3 yrs53.3
UNKNOWN168434Substation-Adjacent69 kV50 MW4.3 yrs53.2
UNKNOWN168432Substation-Adjacent69 kV50 MW4.3 yrs53.2
TAP168433Substation-Adjacent69 kV50 MW4.3 yrs52.9
Mine SiteFormer Mine——4.3 yrs49.6

Every scored site in Stoddard

All 27 sites, best first.

Stoddard datacenter FAQ

How many datacenter sites are in Stoddard?

27 scored datacenter candidate sites, averaging 54.7/100 DC Readiness. That is the 23rd-most of 110 Missouri counties with five or more sites.

What is the highest-scoring datacenter site in Stoddard?

Substation-Adjacent site · 4f50acae scores 62.6/100 DC Readiness, the highest of the 27 scored sites in Stoddard (a substation-adjacent site).

Does Stoddard offer datacenter tax incentives?

Qualified data center sales tax exemption (2019 law); state income tax credits.

What is the natural-hazard risk in Stoddard?

FEMA's National Risk Index rates Stoddard as "Relatively High" (score 38).

What are industrial electricity rates in Stoddard?

Average industrial electricity is 7.73¢/kWh and commercial is 12.89¢/kWh in Stoddard.

More in Missouri

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Stoddard, Missouri”, https://gridcensus.com/datacenter-sites/missouri/stoddard (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Stoddard, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.