Datacenter Sites in Phelps County, Missouri
Phelps County has 32 scored datacenter candidate sites averaging 53.3/100 DC Readiness, with a catalogued aggregate of 451 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Phelps County, Missouri has 32 scored datacenter candidate sites averaging 53.3/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 15th of 110 Missouri counties by number of sites and 78th by average score. The top-scoring site is Busy Bee's Laundry at 63.5/100.
Site-selection context for Phelps County
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
How does Phelps County compare with other counties in Missouri?
By number of scored sites, Phelps County ranks 15th of the 110 Missouri counties with a county page, holding 0.9% of the state's 3,413 sites. Its average DC Readiness of 53.3/100 ranks 78th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1196th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 11 score 55 or higher.
What types of datacenter sites are in Phelps County?
Former Mine sites are the most common (17, 53% of the county's inventory), followed by substation-adjacent (7) and greenfield (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Phelps County?
Industrial electricity averages 7.82¢/kWh and commercial 10.96¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 9 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $3,912 an acre.
By site type
Top datacenter sites in Phelps County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Busy Bee's Laundry | Brownfield | — | 1 MW | 3.9 yrs | 63.5 |
| EC Coal Phelps County | Greenfield | — | — | 3.9 yrs | 61.1 |
| EC Coal Phelps County | Greenfield | — | — | 3.9 yrs | 57.9 |
| TAP138938 | Substation-Adjacent | 138 kV | 100 MW | 3.9 yrs | 57.5 |
| EC Coal Phelps County | Greenfield | — | — | 3.9 yrs | 56.9 |
| UNKNOWN117762 | Substation-Adjacent | 161 kV | 100 MW | 3.9 yrs | 56.8 |
| EC Coal Phelps County | Greenfield | — | — | 3.9 yrs | 55.7 |
| UNKNOWN117858 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 55.2 |
| UNKNOWN117907 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 55.1 |
| UNKNOWN117761 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 55.1 |
| UNKNOWN117888 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 55.0 |
| UNKNOWN117892 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 54.9 |
| EC Coal Phelps County | Greenfield | — | — | 3.9 yrs | 52.0 |
| Public Work Yard | Industrial | — | — | 3.9 yrs | 51.3 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.2 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.2 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.2 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.1 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 51.0 |
Every scored site in Phelps County
All 32 sites, best first.
- Busy Bee's Laundry · 63.5
- EC Coal Phelps County · 54318fa1 · 61.1
- EC Coal Phelps County · d1e44e02 · 57.9
- Substation-Adjacent site · 4975d64c · 57.5
- EC Coal Phelps County · 9365b5d6 · 56.9
- Substation-Adjacent site · d0d52e20 · 56.8
- EC Coal Phelps County · 14ed9112 · 55.7
- Substation-Adjacent site · 6a807dc9 · 55.2
- Substation-Adjacent site · 1bbe7fdd · 55.1
- Substation-Adjacent site · 8cd9fbba · 55.1
- Substation-Adjacent site · 41de43fe · 55.0
- Substation-Adjacent site · d8e5c94e · 54.9
- EC Coal Phelps County · 26123ae2 · 52.0
- Public Work Yard · 51.3
- Mine Site · 62f78867 · 51.2
- Mine Site · a9da604a · 51.2
- Mine Site · ab6f0ab0 · 51.2
- Mine Site · b0750205 · 51.1
- Mine Site · 546f167b · 51.0
- Mine Site · 9597ebe8 · 51.0
- Mine Site · 62a3e016 · 51.0
- Mine Site · cf5478ed · 51.0
- Mine Site · d293a433 · 51.0
- Mine Site · 18c96d0b · 51.0
- Mine Site · c5518e94 · 51.0
- Mine Site · b0780e5a · 51.0
- Mine Site · 5ea8a874 · 51.0
- Mine Site · 85ed6056 · 51.0
- Mine Site · 0374e7cc · 51.0
- Mine Site · 300943a8 · 51.0
- Mine Site · 7cb31106 · 51.0
- MARK TWAIN NATIONAL FOREST · a9ab2967 · 50.7
Phelps County datacenter FAQ
How many datacenter sites are in Phelps County?
32 scored datacenter candidate sites, averaging 53.3/100 DC Readiness. That is the 15th-most of 110 Missouri counties with five or more sites.
What is the highest-scoring datacenter site in Phelps County?
Busy Bee's Laundry scores 63.5/100 DC Readiness, the highest of the 32 scored sites in Phelps County (a brownfield site).
Does Phelps County offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Phelps County?
FEMA's National Risk Index rates Phelps County as "Relatively High" (score 38).
What are industrial electricity rates in Phelps County?
Average industrial electricity is 7.82¢/kWh and commercial is 10.96¢/kWh in Phelps County.
More in Missouri
- All datacenter sites in Missouri· 3,413 sites
- Operating datacenters in Missouri
- Electric substations in Missouri
- Jackson County· 422 sites · avg 58.5
- St. Louis County· 374 sites · avg 56.2
- St. Louis County· 363 sites · avg 55.7
- Greene County· 273 sites · avg 57.8
- Henry· 60 sites · avg 54.6
- Jasper County· 50 sites · avg 55.4
- Former Mine sites in Missouri
- Substation-Adjacent sites in Missouri
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Phelps County, Missouri”, https://gridcensus.com/datacenter-sites/missouri/phelps-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Phelps County, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.