Datacenter Sites in Gentry County, Missouri
Gentry County has 9 scored datacenter candidate sites averaging 52.9/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Gentry County, Missouri has 9 scored datacenter candidate sites averaging 52.9/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 81st of 110 Missouri counties by number of sites and 85th by average score. The top-scoring site is Substation-Adjacent site · e24596f5 at 55.9/100.
Site-selection context for Gentry County
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
How does Gentry County compare with other counties in Missouri?
By number of scored sites, Gentry County ranks 81st of the 110 Missouri counties with a county page, holding 0.3% of the state's 3,413 sites. Its average DC Readiness of 52.9/100 ranks 85th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2493rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.
What types of datacenter sites are in Gentry County?
Substation-Adjacent sites are the most common (7, 78% of the county's inventory), followed by former mine (1) and greenfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Gentry County?
Industrial electricity averages 7.03¢/kWh and commercial 9.87¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $4,448 an acre.
By site type
Top datacenter sites in Gentry County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN117078 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 55.9 |
| UNKNOWN118656 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 53.5 |
| UNKNOWN117134 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 53.5 |
| UNKNOWN117206 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 53.5 |
| TAP140611 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 53.5 |
| UNKNOWN118657 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 53.5 |
| UNKNOWN122830 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 53.1 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 49.9 |
| Greenfield (UNKNOWN117078 - NODAWAY) | Greenfield | 161 kV | 100 MW | 4.3 yrs | 49.6 |
Every scored site in Gentry County
All 9 sites, best first.
- Substation-Adjacent site · e24596f5 · 55.9
- Substation-Adjacent site · c8cdcdd8 · 53.5
- Substation-Adjacent site · bf389de3 · 53.5
- Substation-Adjacent site · 2c009da5 · 53.5
- Substation-Adjacent site · 478083c7 · 53.5
- Substation-Adjacent site · 44d084f0 · 53.5
- Substation-Adjacent site · 8c271709 · 53.1
- Mine Site · 22d8bdd6 · 49.9
- Greenfield (UNKNOWN117078 - NODAWAY) · 49.6
Gentry County datacenter FAQ
How many datacenter sites are in Gentry County?
9 scored datacenter candidate sites, averaging 52.9/100 DC Readiness. That is the 81st-most of 110 Missouri counties with five or more sites.
What is the highest-scoring datacenter site in Gentry County?
Substation-Adjacent site · e24596f5 scores 55.9/100 DC Readiness, the highest of the 9 scored sites in Gentry County (a substation-adjacent site).
Does Gentry County offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Gentry County?
FEMA's National Risk Index rates Gentry County as "Relatively High" (score 38).
What are industrial electricity rates in Gentry County?
Average industrial electricity is 7.03¢/kWh and commercial is 9.87¢/kWh in Gentry County.
More in Missouri
- All datacenter sites in Missouri· 3,413 sites
- Operating datacenters in Missouri
- Electric substations in Missouri
- Jackson County· 422 sites · avg 58.5
- St. Louis County· 374 sites · avg 56.2
- St. Louis County· 363 sites · avg 55.7
- Greene County· 273 sites · avg 57.8
- Henry· 60 sites · avg 54.6
- Jasper County· 50 sites · avg 55.4
- Substation-Adjacent sites in Missouri
- Former Mine sites in Missouri
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Gentry County, Missouri”, https://gridcensus.com/datacenter-sites/missouri/gentry-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Gentry County, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.