Datacenter Sites in Camden County, Missouri

Camden County has 22 scored datacenter candidate sites averaging 53.0/100 DC Readiness, with a catalogued aggregate of 950 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Camden County, Missouri has 22 scored datacenter candidate sites averaging 53.0/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 39th of 110 Missouri counties by number of sites and 83rd by average score. The top-scoring site is Substation-Adjacent site · cf0f8352 at 57.5/100.

22
Candidate sites
53.0/100
Avg DC Readiness
950 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in Camden County

Site-selection context for Camden County

Yessales_tax_exemption
Datacenter tax incentive
11.32¢/kWh
Commercial electricity
9.00¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$2,851
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

How does Camden County compare with other counties in Missouri?

By number of scored sites, Camden County ranks 39th of the 110 Missouri counties with a county page, holding 0.6% of the state's 3,413 sites. Its average DC Readiness of 53.0/100 ranks 83rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1603rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 8 score 55 or higher.

What types of datacenter sites are in Camden County?

Substation-Adjacent sites are the most common (11, 50% of the county's inventory), followed by former mine (10) and federal excess (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Camden County?

Industrial electricity averages 9.00¢/kWh and commercial 11.32¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $2,851 an acre.

By site type

Top datacenter sites in Camden County

Top datacenter sites in Camden County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117421Substation-Adjacent161 kV100 MW3.9 yrs57.5
UNKNOWN121638Substation-Adjacent161 kV100 MW3.9 yrs57.4
TAP173558Substation-Adjacent161 kV100 MW3.9 yrs57.2
UNKNOWN117491Substation-Adjacent161 kV100 MW3.9 yrs57.1
UNKNOWN117525Substation-Adjacent161 kV100 MW3.9 yrs56.9
TAP156262Substation-Adjacent161 kV100 MW3.9 yrs56.2
UNKNOWN117481Substation-Adjacent161 kV100 MW3.9 yrs56.1
UNKNOWN117851Substation-Adjacent69 kV50 MW3.9 yrs55.0
UNKNOWN138954Substation-Adjacent161 kV100 MW4.3 yrs54.6
UNKNOWN117422Substation-Adjacent69 kV50 MW3.9 yrs54.5
UNKNOWN117129Substation-Adjacent69 kV50 MW3.9 yrs54.4
Mine SiteFormer Mine——3.9 yrs50.7
Mine SiteFormer Mine——3.9 yrs50.7
Mine SiteFormer Mine——3.9 yrs50.7
Mine SiteFormer Mine——3.9 yrs50.6
Mine SiteFormer Mine——3.9 yrs50.5
Mine SiteFormer Mine——3.9 yrs50.5
Mine SiteFormer Mine——3.9 yrs49.9
Mine SiteFormer Mine——3.9 yrs49.5
Mine SiteFormer Mine——4.3 yrs49.3
Mine SiteFormer Mine——4.3 yrs49.3
SUNSHINE (KAISER) MISSOURIFederal Excess——4.3 yrs48.3

Every scored site in Camden County

All 22 sites, best first.

Camden County datacenter FAQ

How many datacenter sites are in Camden County?

22 scored datacenter candidate sites, averaging 53.0/100 DC Readiness. That is the 39th-most of 110 Missouri counties with five or more sites.

What is the highest-scoring datacenter site in Camden County?

Substation-Adjacent site · cf0f8352 scores 57.5/100 DC Readiness, the highest of the 22 scored sites in Camden County (a substation-adjacent site).

Does Camden County offer datacenter tax incentives?

Qualified data center sales tax exemption (2019 law); state income tax credits.

What is the natural-hazard risk in Camden County?

FEMA's National Risk Index rates Camden County as "Relatively High" (score 38).

What are industrial electricity rates in Camden County?

Average industrial electricity is 9.00¢/kWh and commercial is 11.32¢/kWh in Camden County.

More in Missouri

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Camden County, Missouri”, https://gridcensus.com/datacenter-sites/missouri/camden-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Camden County, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.