Datacenter Sites in Brown County, Minnesota
Brown County has 55 scored datacenter candidate sites averaging 55.6/100 DC Readiness, with a catalogued aggregate of 1,100 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Brown County, Minnesota has 55 scored datacenter candidate sites averaging 55.6/100 DC Readiness, roughly in line with the Minnesota average of 56.0. It ranks 11th of 85 Minnesota counties by number of sites and 45th by average score. The top-scoring site is EC Near Sleepy Eye · e1619b2b at 59.7/100.
Site-selection context for Brown County
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
How does Brown County compare with other counties in Minnesota?
By number of scored sites, Brown County ranks 11th of the 85 Minnesota counties with a county page, holding 1.7% of the state's 3,216 sites. Its average DC Readiness of 55.6/100 ranks 45th in the state and is roughly in line with the national average of 53.0. Nationally it has the 679th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 38 score 55 or higher.
What types of datacenter sites are in Brown County?
Greenfield sites are the most common (24, 44% of the county's inventory), followed by substation-adjacent (22) and former mine (8). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Brown County?
Industrial electricity averages 8.49¢/kWh and commercial 12.99¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (25). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 600 cooling degree days a year with a mean temperature of 42°F. Land is valued around $8,310 an acre.
By site type
Top datacenter sites in Brown County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 59.7 |
| EC Near Springfield (MN) | Greenfield | — | — | 4.3 yrs | 59.2 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 59.0 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 58.8 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 58.7 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 58.5 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 58.4 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 58.3 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 58.3 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 58.1 |
| EC Near Springfield (MN) | Greenfield | — | — | 4.3 yrs | 58.1 |
| EC Near Sleepy Eye | Greenfield | — | — | 4.3 yrs | 57.8 |
| EC Near Springfield (MN) | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Springfield (MN) | Greenfield | — | — | 4.3 yrs | 57.6 |
| EC Near Springfield (MN) | Greenfield | — | — | 4.3 yrs | 57.2 |
| EC Near Springfield (MN) | Greenfield | — | — | 4.3 yrs | 56.9 |
| EC Near Springfield (MN) | Greenfield | — | — | 4.3 yrs | 56.8 |
| TAP161655 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.5 |
| UNKNOWN130268 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.5 |
| UNKNOWN157186 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.4 |
| TAP170697 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.4 |
| UNKNOWN158005 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.4 |
| UNKNOWN156493 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.4 |
| TAP159937 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.4 |
| TAP138622 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.3 |
Every scored site in Brown County
All 55 sites, best first.
- EC Near Sleepy Eye · e1619b2b · 59.7
- EC Near Springfield (MN) · 631abd6f · 59.2
- EC Near Sleepy Eye · 1602bdf5 · 59.0
- EC Near Sleepy Eye · b98b63b2 · 58.8
- EC Near Sleepy Eye · 3114c8c0 · 58.7
- EC Near Sleepy Eye · 90f84bb0 · 58.5
- EC Near Sleepy Eye · fb918316 · 58.4
- EC Near Sleepy Eye · faf2d458 · 58.3
- EC Near Sleepy Eye · 35815cb8 · 58.3
- EC Near Springfield (MN) · 106c0a09 · 58.1
- EC Near Sleepy Eye · ab0ecda4 · 58.1
- EC Near Sleepy Eye · ad2e4f9f · 57.8
- EC Near Springfield (MN) · 5aa9e737 · 57.7
- EC Near Springfield (MN) · e87ef112 · 57.6
- EC Near Springfield (MN) · e497ef87 · 57.2
- EC Near Springfield (MN) · 986da72c · 56.9
- EC Near Springfield (MN) · 858752de · 56.8
- Substation-Adjacent site · e7cb3783 · 56.5
- Substation-Adjacent site · 770e5d68 · 56.5
- Substation-Adjacent site · 56ddee88 · 56.4
- Substation-Adjacent site · 066b73d5 · 56.4
- Substation-Adjacent site · e24e447d · 56.4
- Substation-Adjacent site · e516b91c · 56.4
- Substation-Adjacent site · 4d623ef1 · 56.4
- Substation-Adjacent site · c1a35019 · 56.3
- Substation-Adjacent site · 0e56e7fd · 56.3
- Substation-Adjacent site · 22a725b5 · 56.3
- Substation-Adjacent site · df9ec212 · 56.2
- Substation-Adjacent site · f211306e · 56.0
- Substation-Adjacent site · bde73fa1 · 55.9
- Substation-Adjacent site · ec486f94 · 55.9
- Substation-Adjacent site · 9270c2db · 55.8
- Substation-Adjacent site · 47c0a77e · 55.8
- Substation-Adjacent site · bb42cca6 · 55.8
- Substation-Adjacent site · 2fb12abd · 55.7
- Substation-Adjacent site · 4104ff42 · 55.7
- Substation-Adjacent site · e0ba9bc0 · 55.6
- Substation-Adjacent site · ce4cecae · 55.3
- Substation-Adjacent site · 8bc19844 · 54.9
- EC Near Springfield (MN) · c615623f · 54.1
- EC Near Springfield (MN) · e964e347 · 53.8
- EC Near Springfield (MN) · 265365ff · 53.7
- EC Near Springfield (MN) · 40cd8051 · 53.5
- EC Near Sleepy Eye · 7bf2a132 · 53.3
- EC Near Sleepy Eye · b37f20f2 · 52.9
- EC Near Springfield (MN) · 1e632f2b · 52.7
- Mine Site · 42566b29 · 52.5
- Mine Site · 4bc7edc5 · 52.5
- Mine Site · f2c780df · 52.4
- Mine Site · 6b2cc1d1 · 52.4
- Mine Site · 1fcc7eaf · 52.2
- Mine Site · 237ab48a · 52.1
- Sanborn Auction & Salvage II · 51.7
- Mine Site · ecba1540 · 51.5
- Mine Site · 314ea5f9 · 47.5
Brown County datacenter FAQ
How many datacenter sites are in Brown County?
55 scored datacenter candidate sites, averaging 55.6/100 DC Readiness. That is the 11th-most of 85 Minnesota counties with five or more sites.
What is the highest-scoring datacenter site in Brown County?
EC Near Sleepy Eye · e1619b2b scores 59.7/100 DC Readiness, the highest of the 55 scored sites in Brown County (a greenfield site).
Does Brown County offer datacenter tax incentives?
Sales tax exemption on DC equipment and electricity for qualified DCs.
What is the natural-hazard risk in Brown County?
FEMA's National Risk Index rates Brown County as "Relatively Moderate" (score 25).
What are industrial electricity rates in Brown County?
Average industrial electricity is 8.49¢/kWh and commercial is 12.99¢/kWh in Brown County.
More in Minnesota
- All datacenter sites in Minnesota· 3,216 sites
- Operating datacenters in Minnesota
- Electric substations in Minnesota
- Dakota County· 374 sites · avg 56.4
- Hennepin County· 237 sites · avg 58.0
- St. Louis County· 179 sites · avg 54.1
- Ramsey County· 171 sites · avg 58.2
- Blue Earth County· 85 sites · avg 54.1
- Itasca County· 84 sites · avg 55.2
- Greenfield sites in Minnesota
- Substation-Adjacent sites in Minnesota
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Brown County, Minnesota”, https://gridcensus.com/datacenter-sites/minnesota/brown-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Brown County, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.