Brown County, Minnesota · MISO

DC Readiness
55.4
Good / 100

TAP159937 is a substation-adjacent datacenter candidate site in Brown County, Minnesota, interconnecting through MISO. It screens at 55.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP159937
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityRENVILLE-SIBLEY COOP PWR ASSNnot available

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPNP Belle Plaine (MSP1)
IXP distance46.8 mi
Fiber providers8
Fiber coverage74.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score75/100

Location context

Nearest datacenterNP Belle Plaine (MSP1)
DC distance46.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.99¢/kWh
Industrial electricity8.49¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$8,310

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP159937

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Brown County, ranked by DC Readiness.

Sites near TAP159937
SiteTypeVoltageCapacityQueue waitScore
EC Near Sleepy EyeGreenfield1.4 yrs60.0
EC Near Springfield (MN)Greenfield1.4 yrs59.5
EC Near Sleepy EyeGreenfield1.4 yrs59.3
EC Near Sleepy EyeGreenfield1.4 yrs59.1
EC Near Sleepy EyeGreenfield1.4 yrs59.0
EC Near Sleepy EyeGreenfield1.4 yrs58.8
EC Near Sleepy EyeGreenfield1.4 yrs58.7
EC Near Sleepy EyeGreenfield1.4 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.