Datacenter Sites in RANDOLPH, Indiana

RANDOLPH has 55 scored datacenter candidate sites averaging 50.1/100 DC Readiness, with a catalogued aggregate of 1,054 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

RANDOLPH, Indiana has 55 scored datacenter candidate sites averaging 50.1/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 51st of 91 Indiana counties by number of sites and 86th by average score. The top-scoring site is Substation-Adjacent site · 54385ad7 at 59.8/100.

55
Candidate sites
50.1/100
Avg DC Readiness
1,054 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in RANDOLPH

Site-selection context for RANDOLPH

Yessales_tax_exemption
Datacenter tax incentive
12.17¢/kWh
Commercial electricity
8.46¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$9,308
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does RANDOLPH compare with other counties in Indiana?

By number of scored sites, RANDOLPH ranks 51st of the 91 Indiana counties with a county page, holding 0.6% of the state's 8,629 sites. Its average DC Readiness of 50.1/100 ranks 86th in the state and is roughly in line with the national average of 53.0. Nationally it has the 679th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 8 score 55 or higher.

What types of datacenter sites are in RANDOLPH?

Manufacturing sites are the most common (24, 44% of the county's inventory), followed by greenfield (13) and industrial (11). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in RANDOLPH?

Industrial electricity averages 8.46¢/kWh and commercial 12.17¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $9,308 an acre.

By site type

Top datacenter sites in RANDOLPH

Top datacenter sites in RANDOLPH
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN167571Substation-Adjacent345 kV600 MW3.0 yrs59.8
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs58.9
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs57.0
OZ RandolphGreenfield——3.0 yrs56.0
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.6
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.4
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.3
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.1
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs54.8
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs54.7
UNKNOWN124049Substation-Adjacent138 kV100 MW3.0 yrs54.4
UNKNOWN124043Substation-Adjacent138 kV100 MW3.0 yrs54.1
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs53.1
PRICESubstation-Adjacent69 kV50 MW3.0 yrs52.0
ANCHOR HOCKINGSubstation-Adjacent69 kV50 MW3.0 yrs51.9
WINCHESTERSubstation-Adjacent69 kV50 MW3.0 yrs51.9
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs51.4
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs50.1
Former Michiana DairyIndustrial——3.0 yrs48.1
NEUDECKER MFG. LTD. (CUTTING TOOL AND MACHINE TOOL ACCESSORY MANUFACTURING)Manufacturing——3.0 yrs48.1
Former Backstay WeltIndustrial——3.0 yrs48.1
Union City Body CompanyIndustrial——3.0 yrs48.1
WORKHORSE CUSTOM CHASSIS, LLC (NOT AVAILABLE)Manufacturing——3.0 yrs48.1
Former Central ManufacturingIndustrial——3.0 yrs48.1
REIT-PRICE MFG. CO. (BROOM, BRUSH, AND MOP MANUFACTURING)Manufacturing——3.0 yrs48.1

Every scored site in RANDOLPH

All 55 sites, best first.

RANDOLPH datacenter FAQ

How many datacenter sites are in RANDOLPH?

55 scored datacenter candidate sites, averaging 50.1/100 DC Readiness. That is the 51st-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in RANDOLPH?

Substation-Adjacent site · 54385ad7 scores 59.8/100 DC Readiness, the highest of the 55 scored sites in RANDOLPH (a substation-adjacent site).

Does RANDOLPH offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in RANDOLPH?

FEMA's National Risk Index rates RANDOLPH as "Relatively Moderate" (score 32).

What are industrial electricity rates in RANDOLPH?

Average industrial electricity is 8.46¢/kWh and commercial is 12.17¢/kWh in RANDOLPH.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in RANDOLPH, Indiana”, https://gridcensus.com/datacenter-sites/indiana/randolph (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for RANDOLPH, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.