Datacenter Sites in ALLEN, Indiana

ALLEN has 415 scored datacenter candidate sites averaging 53.8/100 DC Readiness, with a catalogued aggregate of 3,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

ALLEN, Indiana has 415 scored datacenter candidate sites averaging 53.8/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 4th of 91 Indiana counties by number of sites and 32nd by average score. The top-scoring site is ALLEN at 65.1/100.

415
Candidate sites
53.8/100
Avg DC Readiness
3,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ALLEN

Site-selection context for ALLEN

Yessales_tax_exemption
Datacenter tax incentive
11.79¢/kWh
Commercial electricity
8.51¢/kWh
Industrial electricity
16
Fiber providers
Low
Water stress
$7,803
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does ALLEN compare with other counties in Indiana?

By number of scored sites, ALLEN ranks 4th of the 91 Indiana counties with a county page, holding 4.8% of the state's 8,629 sites. Its average DC Readiness of 53.8/100 ranks 32nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 22nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 29 score 55 or higher.

What types of datacenter sites are in ALLEN?

Manufacturing sites are the most common (340, 82% of the county's inventory), followed by industrial (36) and substation-adjacent (28). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in ALLEN?

Industrial electricity averages 8.51¢/kWh and commercial 11.79¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 16 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $7,803 an acre.

By site type

Top datacenter sites in ALLEN

Top datacenter sites in ALLEN
SiteTypeVoltageCapacityQueue waitScore
ALLENSubstation-Adjacent345 kV600 MW3.0 yrs65.1
ROBISON PARK (345 KV)Substation-Adjacent345 kV600 MW3.0 yrs64.8
BASSSubstation-Adjacent138 kV100 MW3.0 yrs60.6
INDUSTRIAL PARKSubstation-Adjacent138 kV100 MW3.0 yrs60.6
UNKNOWN123161Substation-Adjacent138 kV100 MW3.0 yrs60.5
HILLCRESTSubstation-Adjacent138 kV100 MW3.0 yrs59.7
WAYNE TRACESubstation-Adjacent138 kV100 MW3.0 yrs59.7
TAP141267Substation-Adjacent138 kV100 MW3.0 yrs59.7
WAYNEDALESubstation-Adjacent138 kV100 MW3.0 yrs59.7
LINCOLNSubstation-Adjacent138 kV100 MW3.0 yrs59.6
MCKINLEYSubstation-Adjacent138 kV100 MW3.0 yrs59.6
SPY RUNSubstation-Adjacent138 kV100 MW3.0 yrs59.5
UNKNOWN122665Substation-Adjacent138 kV100 MW3.0 yrs59.4
UNKNOWN122662Substation-Adjacent138 kV100 MW3.0 yrs59.3
STATE STREETSubstation-Adjacent138 kV100 MW3.0 yrs59.3
HARPERSubstation-Adjacent138 kV100 MW3.0 yrs59.2
TRIERSubstation-Adjacent138 kV100 MW3.0 yrs59.1
UNKNOWN122660Substation-Adjacent138 kV100 MW3.0 yrs59.0
UNKNOWN122668Substation-Adjacent138 kV100 MW3.0 yrs59.0
UNKNOWN122670Substation-Adjacent138 kV100 MW3.0 yrs59.0
HUNTERTOWNSubstation-Adjacent138 kV100 MW3.0 yrs58.9
GRABILLSubstation-Adjacent138 kV100 MW3.0 yrs58.8
WOODBURNSubstation-Adjacent138 kV100 MW3.0 yrs57.9
OZ AllenGreenfield——3.0 yrs57.9
TILLMANSubstation-Adjacent138 kV100 MW3.0 yrs57.8

Every scored site in ALLEN

All 415 sites, best first.

ALLEN datacenter FAQ

How many datacenter sites are in ALLEN?

415 scored datacenter candidate sites, averaging 53.8/100 DC Readiness. That is the 4th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in ALLEN?

ALLEN scores 65.1/100 DC Readiness, the highest of the 415 scored sites in ALLEN (a substation-adjacent site).

Does ALLEN offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in ALLEN?

FEMA's National Risk Index rates ALLEN as "Relatively Moderate" (score 32).

What are industrial electricity rates in ALLEN?

Average industrial electricity is 8.51¢/kWh and commercial is 11.79¢/kWh in ALLEN.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in ALLEN, Indiana”, https://gridcensus.com/datacenter-sites/indiana/allen (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for ALLEN, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.