DC Readiness
59.6
Good / 100

Greenfield (COUNTY LINE - ROBISON PARK (13) is a greenfield datacenter candidate site in ALLEN, Florida, interconnecting through SERC. It screens at 59.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCOUNTY LINE
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPINdigital
IXP distance8.6 mi
Fiber providers16
Fiber coverage80.2%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterINdigital
DC distance8.6 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.79¢/kWh
Industrial electricity8.51¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,803

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (COUNTY LINE - ROBISON PARK (13)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
72
Fiber connectivity12%
88
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in ALLEN, ranked by DC Readiness.

Sites near Greenfield (COUNTY LINE - ROBISON PARK (13)
SiteTypeVoltageCapacityQueue waitScore
ALLENSubstation-Adjacent345 kV600 MW3.8 yrs65.4
ROBISON PARK (345 KV)Substation-Adjacent345 kV600 MW3.8 yrs65.2
INDUSTRIAL PARKSubstation-Adjacent138 kV100 MW3.8 yrs61.0
UNKNOWN123161Substation-Adjacent138 kV100 MW3.8 yrs60.9
BASSSubstation-Adjacent138 kV100 MW3.8 yrs60.9
WAYNE TRACESubstation-Adjacent138 kV100 MW3.8 yrs60.1
HILLCRESTSubstation-Adjacent138 kV100 MW3.8 yrs60.0
WAYNEDALESubstation-Adjacent138 kV100 MW3.8 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.