Former Coca Cola Facility
IndustrialALLEN, Indiana · PJM
At a glance
Former Coca Cola Facility is an industrial datacenter candidate site in ALLEN, Indiana, scoring 54.5/100 DC Readiness — 103rd of 415 scored sites in the county. It sits in the PJM grid region and the INDIANA MICHIGAN POWER CO service territory, where interconnection has averaged 3.0 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Get alerts
Track Former Coca Cola Facility
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Former Coca Cola Facility compare with other sites in ALLEN?
Former Coca Cola Facility ranks 103rd of 415 scored candidate sites in ALLEN. Its 54.5/100 is roughly in line with the county average of 54.9. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.
Against the Indiana average, its strongest sub-score is fiber connectivity (95 vs 79) and its weakest is speed to power (42 vs 46). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Former Coca Cola Facility to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is Lifeline Ft Wayne at 3.2 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is INdigital, 7 miles away.
What are the flood, water and hazard risks at Former Coca Cola Facility?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates ALLEN "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in ALLEN, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| ALLEN | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 66.2 |
| ROBISON PARK (345 KV) | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 66.0 |
| INDUSTRIAL PARK | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 61.8 |
| UNKNOWN123161 | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 61.7 |
| BASS | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 61.7 |
| WAYNEDALE | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 60.8 |
| HILLCREST | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 60.8 |
| WAYNE TRACE | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 60.8 |
Former Coca Cola Facility: common questions
What is the DC Readiness score of Former Coca Cola Facility?
Former Coca Cola Facility scores 54.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 103rd of 415 scored sites in ALLEN. The ALLEN average is 54.9 and the Indiana average is 54.0.
Which electric utility serves Former Coca Cola Facility?
INDIANA MICHIGAN POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is AMERICAN ELECTRIC POWER CO.
What grid region is Former Coca Cola Facility in?
Former Coca Cola Facility is in the PJM region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.
Is Former Coca Cola Facility in a flood zone?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).
How far is Former Coca Cola Facility from an internet exchange?
The nearest internet exchange facility is Lifeline Ft Wayne, about 3.2 miles away; 16 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Former Coca Cola Facility, ALLEN, IN”, https://gridcensus.com/datacenter-sites/indiana/allen/former-coca-cola-facility-1e801af9 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Former Coca Cola Facility, ALLEN is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.