Datacenter Sites in ELKHART, Indiana
ELKHART has 771 scored datacenter candidate sites averaging 54.6/100 DC Readiness, with a catalogued aggregate of 2,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
771
Candidate sites
54.6/100
Avg DC Readiness
2,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for ELKHART
Yessales_tax_exemption
Datacenter tax incentive
15.08¢/kWh
Commercial electricity
7.53¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$11,769
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in ELKHART
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP138974 | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 64.8 |
| UNKNOWN122939 | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 64.0 |
| OZ Elkhart | Greenfield | — | — | 3.0 yrs | 62.0 |
| OZ Elkhart | Greenfield | — | — | 3.0 yrs | 61.6 |
| OZ Elkhart | Greenfield | — | — | 3.0 yrs | 61.2 |
| UNKNOWN123077 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.1 |
| CONCORD | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.1 |
| UNKNOWN122938 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN123080 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN123081 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN123076 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN122873 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| TAP138975 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN122941 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN122933 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN122936 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.9 |
| DUNLAP | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.0 |
| CARRIAGE, INC. (TRAVEL TRAILER AND CAMPER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 56.1 |
| FOREST RIVER, INC., TENT CAMPER DIV. (TRAVEL TRAILER AND CAMPER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 56.0 |
| AMERI-CAMP (TRAVEL TRAILER AND CAMPER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.9 |
| MM SPIRIT (TRUCK TRAILER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.9 |
| GLAVAL BUS (MOTOR HOME MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.8 |
| FOREST RIVER, INC. (H Q) (MOTOR HOME MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.8 |
| SPECIALTY HEAT TREATING, INC. (METAL HEAT TREATING) | Manufacturing | — | — | 3.5 yrs | 55.8 |
| GINDOR, INC. (GASKET, PACKING, AND SEALING DEVICE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.7 |
ELKHART datacenter FAQ
- How many datacenter sites are in ELKHART?
- 771 scored datacenter candidate sites, averaging 54.6/100 DC Readiness.
- Does ELKHART offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in ELKHART?
- FEMA's National Risk Index rates ELKHART as "Relatively Moderate" (score 32).
- What are industrial electricity rates in ELKHART?
- Average industrial electricity is 7.53¢/kWh and commercial is 15.08¢/kWh in ELKHART.