Skip to content
Gridcensus

Datacenter Sites in ELKHART, Indiana

ELKHART has 786 scored datacenter candidate sites averaging 55.7/100 DC Readiness, with a catalogued aggregate of 7,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

786
Candidate sites
55.7/100
Avg DC Readiness
7,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ELKHART

Site-selection context for ELKHART

Yessales_tax_exemption
Datacenter tax incentive
15.08¢/kWh
Commercial electricity
7.53¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$11,769
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in ELKHART

Top datacenter sites in ELKHART
SiteTypeVoltageCapacityQueue waitScore
TAP138974Substation-Adjacent345 kV600 MW3.8 yrs64.7
UNKNOWN122939Substation-Adjacent345 kV600 MW3.8 yrs63.5
OZ ElkhartGreenfield3.0 yrs63.2
OZ ElkhartGreenfield3.0 yrs62.8
OZ ElkhartGreenfield3.0 yrs62.4
UNKNOWN123077Substation-Adjacent138 kV100 MW3.8 yrs59.2
UNKNOWN123081Substation-Adjacent138 kV100 MW3.8 yrs59.0
UNKNOWN123076Substation-Adjacent138 kV100 MW3.8 yrs59.0
UNKNOWN122941Substation-Adjacent138 kV100 MW3.8 yrs58.9
CONCORDSubstation-Adjacent138 kV100 MW3.8 yrs58.8
UNKNOWN122936Substation-Adjacent138 kV100 MW3.8 yrs58.8
UNKNOWN123080Substation-Adjacent138 kV100 MW3.8 yrs58.7
UNKNOWN122938Substation-Adjacent138 kV100 MW3.8 yrs58.7
TAP138975Substation-Adjacent138 kV100 MW3.8 yrs58.7
UNKNOWN122873Substation-Adjacent138 kV100 MW3.8 yrs58.7
UNKNOWN122933Substation-Adjacent138 kV100 MW3.8 yrs58.6
DUNLAPSubstation-Adjacent138 kV100 MW3.8 yrs57.4
CARRIAGE, INC. (TRAVEL TRAILER AND CAMPER MANUFACTURING)Manufacturing3.5 yrs57.1
FOREST RIVER, INC., TENT CAMPER DIV. (TRAVEL TRAILER AND CAMPER MANUFACTURING)Manufacturing3.5 yrs57.0
MM SPIRIT (TRUCK TRAILER MANUFACTURING)Manufacturing3.5 yrs57.0
AMERI-CAMP (TRAVEL TRAILER AND CAMPER MANUFACTURING)Manufacturing3.5 yrs57.0
DUNCAN SYSTEMS, INC. (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS)Manufacturing3.5 yrs56.8
QUALITY ENGINEERED PRODUCTS, INC. (NOT AVAILABLE)Manufacturing3.5 yrs56.8
ASSEMBLY MASTERS, INC. (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing3.5 yrs56.8
METALCRAFT PRECISION MACHINING, INC. (MACHINE SHOPS)Manufacturing3.5 yrs56.8

ELKHART datacenter FAQ

How many datacenter sites are in ELKHART?
786 scored datacenter candidate sites, averaging 55.7/100 DC Readiness.
Does ELKHART offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in ELKHART?
FEMA's National Risk Index rates ELKHART as "Relatively Moderate" (score 32).
What are industrial electricity rates in ELKHART?
Average industrial electricity is 7.53¢/kWh and commercial is 15.08¢/kWh in ELKHART.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ELKHART, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.