Datacenter Sites in ELKHART, Indiana
ELKHART has 786 scored datacenter candidate sites averaging 55.7/100 DC Readiness, with a catalogued aggregate of 7,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
786
Candidate sites
55.7/100
Avg DC Readiness
7,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for ELKHART
Yessales_tax_exemption
Datacenter tax incentive
15.08¢/kWh
Commercial electricity
7.53¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$11,769
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in ELKHART
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP138974 | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 64.7 |
| UNKNOWN122939 | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 63.5 |
| OZ Elkhart | Greenfield | — | — | 3.0 yrs | 63.2 |
| OZ Elkhart | Greenfield | — | — | 3.0 yrs | 62.8 |
| OZ Elkhart | Greenfield | — | — | 3.0 yrs | 62.4 |
| UNKNOWN123077 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.2 |
| UNKNOWN123081 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN123076 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 59.0 |
| UNKNOWN122941 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.9 |
| CONCORD | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.8 |
| UNKNOWN122936 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.8 |
| UNKNOWN123080 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.7 |
| UNKNOWN122938 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.7 |
| TAP138975 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.7 |
| UNKNOWN122873 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.7 |
| UNKNOWN122933 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.6 |
| DUNLAP | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.4 |
| CARRIAGE, INC. (TRAVEL TRAILER AND CAMPER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 57.1 |
| FOREST RIVER, INC., TENT CAMPER DIV. (TRAVEL TRAILER AND CAMPER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 57.0 |
| MM SPIRIT (TRUCK TRAILER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 57.0 |
| AMERI-CAMP (TRAVEL TRAILER AND CAMPER MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 57.0 |
| DUNCAN SYSTEMS, INC. (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS) | Manufacturing | — | — | 3.5 yrs | 56.8 |
| QUALITY ENGINEERED PRODUCTS, INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 56.8 |
| ASSEMBLY MASTERS, INC. (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 56.8 |
| METALCRAFT PRECISION MACHINING, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 56.8 |
ELKHART datacenter FAQ
- How many datacenter sites are in ELKHART?
- 786 scored datacenter candidate sites, averaging 55.7/100 DC Readiness.
- Does ELKHART offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in ELKHART?
- FEMA's National Risk Index rates ELKHART as "Relatively Moderate" (score 32).
- What are industrial electricity rates in ELKHART?
- Average industrial electricity is 7.53¢/kWh and commercial is 15.08¢/kWh in ELKHART.
Dataset updated . Screening estimates derived from public data sources.