Rescue Mission

Industrial

ALLEN, Indiana · PJM

DC Readiness
53.4
Fair / 100

At a glance

Rescue Mission is an industrial datacenter candidate site in ALLEN, Indiana, scoring 53.4/100 DC Readiness — 397th of 415 scored sites in the county. It sits in the PJM grid region and the INDIANA MICHIGAN POWER CO service territory, where interconnection has averaged 3.0 years from request to operation.

Power & interconnection

UtilityINDIANA MICHIGAN POWER COinvestor ownedmoderate to large load · terms ≥ 70 MWLarge Load / Industrial Power tariff (≥70 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth406
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPINdigital
IXP distance4.9 mi
Fiber providers16
Fiber coverage80.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score53/100

Location context

Nearest datacenterINdigital
DC distance4.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.79¢/kWh
Industrial electricity8.51¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,803

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Rescue Mission

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Rescue Mission compare with other sites in ALLEN?

Rescue Mission ranks 397th of 415 scored candidate sites in ALLEN. Its 53.4/100 is roughly in line with the county average of 54.9. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.

Against the Indiana average, its strongest sub-score is fiber connectivity (93 vs 79) and its weakest is natural hazard (53 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Rescue Mission to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is INdigital at 4.9 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is INdigital, 4.9 miles away.

What are the flood, water and hazard risks at Rescue Mission?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. At the county level, FEMA's National Risk Index rates ALLEN "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
42
Fiber connectivity12%
93
Energy cost10%
50
Water risk7%
90
Natural hazard6%
53
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in ALLEN, ranked by DC Readiness.

Sites near Rescue Mission
SiteTypeVoltageCapacityQueue waitScore
ALLENSubstation-Adjacent345 kV600 MW3.0 yrs66.2
ROBISON PARK (345 KV)Substation-Adjacent345 kV600 MW3.0 yrs66.0
INDUSTRIAL PARKSubstation-Adjacent138 kV100 MW3.0 yrs61.8
UNKNOWN123161Substation-Adjacent138 kV100 MW3.0 yrs61.7
BASSSubstation-Adjacent138 kV100 MW3.0 yrs61.7
WAYNEDALESubstation-Adjacent138 kV100 MW3.0 yrs60.8
HILLCRESTSubstation-Adjacent138 kV100 MW3.0 yrs60.8
WAYNE TRACESubstation-Adjacent138 kV100 MW3.0 yrs60.8

Rescue Mission: common questions

What is the DC Readiness score of Rescue Mission?

Rescue Mission scores 53.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 397th of 415 scored sites in ALLEN. The ALLEN average is 54.9 and the Indiana average is 54.0.

Which electric utility serves Rescue Mission?

INDIANA MICHIGAN POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is AMERICAN ELECTRIC POWER CO.

What grid region is Rescue Mission in?

Rescue Mission is in the PJM region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.

Is Rescue Mission in a flood zone?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

How far is Rescue Mission from an internet exchange?

The nearest internet exchange facility is INdigital, about 4.9 miles away; 16 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Rescue Mission, ALLEN, IN”, https://gridcensus.com/datacenter-sites/indiana/allen/rescue-mission-06cafd7e (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Rescue Mission, ALLEN is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.