ANCHOR HOCKING

Substation-Adjacent

RANDOLPH, Indiana · PJM

DC Readiness
52.3
Fair / 100

ANCHOR HOCKING is a substation-adjacent datacenter candidate site in RANDOLPH, Indiana, interconnecting through PJM. It screens at 52.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationANCHOR HOCKING
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityINDIANA MICHIGAN POWER COinvestor ownedmoderate to large load · terms ≥ 70 MWLarge Load / Industrial Power tariff (≥70 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEncore Technologies MSB1
IXP distance55.1 mi
Fiber providers5
Fiber coverage49.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterEncore Technologies MSB1
DC distance55.1 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.17¢/kWh
Industrial electricity8.46¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$9,308

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track ANCHOR HOCKING

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
38
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in RANDOLPH, ranked by DC Readiness.

Sites near ANCHOR HOCKING
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN167571Substation-Adjacent345 kV600 MW3.8 yrs60.1
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs57.3
OZ RandolphGreenfield——3.0 yrs56.6
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs56.2
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs56.0
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.9
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.7
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.