Cabin Creek Renewable Energy Station

Brownfield

RANDOLPH, Indiana · PJM

DC Readiness
47.7
Fair / 100

Cabin Creek Renewable Energy Station is a brownfield datacenter candidate site in RANDOLPH, Indiana, interconnecting through PJM. It screens at 47.7/100 DC Readiness with a catalogued 4 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Available capacity4 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh
UtilityINDIANA MICHIGAN POWER COinvestor ownedmoderate to large load · terms ≥ 70 MWLarge Load / Industrial Power tariff (≥70 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.2 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPORI.NET Noblesville
IXP distance47.9 mi
Fiber providers5
Fiber coverage49.1%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance112.0 mi

Site characteristics

Site typeBrownfield
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usegas
Existing capacity4 MW

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteRANDOLPH CTY LANDFILL
Hazard sub-score58/100
Construction cost index88.6 (avg 100)

Location context

Nearest datacenterORI.NET Noblesville
DC distance47.9 mi
Nearest rail5.4 mi
Nearest gas pipeline1.4 mi
Nearest fiber route51.3 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.17¢/kWh
Industrial electricity8.46¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$9,308

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Cabin Creek Renewable Energy Station

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
23
Speed to power20%
34
Fiber connectivity12%
19
Energy cost10%
83
Water risk7%
92
Natural hazard6%
58
Buildability7%
65
Labor market4%
50
DC cluster4%
45
Land / acreage3%
51
Construction cost3%
76
Gas pipeline2%
95
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in RANDOLPH, ranked by DC Readiness.

Sites near Cabin Creek Renewable Energy Station
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN167571Substation-Adjacent345 kV600 MW3.8 yrs60.1
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs57.3
OZ RandolphGreenfield——3.0 yrs56.6
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs56.2
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs56.0
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.9
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.7
EC Near Cabin Creek Renewable Energy StationGreenfield——3.0 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Cabin Creek Renewable Energy Station, RANDOLPH. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.