Datacenter Sites in POSEY, Indiana

POSEY has 67 scored datacenter candidate sites averaging 53.8/100 DC Readiness, with a catalogued aggregate of 1,000 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

67
Candidate sites
53.8/100
Avg DC Readiness
1,000 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in POSEY

Site-selection context for POSEY

Yessales_tax_exemption
Datacenter tax incentive
13.52¢/kWh
Commercial electricity
9.01¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$7,200
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in POSEY

Top datacenter sites in POSEY
SiteTypeVoltageCapacityQueue waitScore
EC Near A B BrownGreenfield——3.0 yrs60.4
EC Near A B BrownGreenfield——3.0 yrs58.9
EC Coal Posey CountyGreenfield——3.0 yrs58.7
EC Coal Posey CountyGreenfield——3.0 yrs58.4
EC Near A B BrownGreenfield——3.0 yrs58.3
UNKNOWN127881Substation-Adjacent138 kV100 MW3.8 yrs58.1
EC Coal Posey CountyGreenfield——3.0 yrs58.0
EC Near A B BrownGreenfield——3.0 yrs57.4
UNKNOWN127862Substation-Adjacent138 kV100 MW3.8 yrs57.4
EC Near A B BrownGreenfield——3.0 yrs57.4
EC Coal Posey CountyGreenfield——3.0 yrs57.3
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs56.9
EC Near A B BrownGreenfield——3.0 yrs56.9
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs56.9
EC Coal Posey CountyGreenfield——3.0 yrs56.6
UNKNOWN127564Substation-Adjacent138 kV100 MW3.8 yrs56.5
WADESVILLESubstation-Adjacent69 kV50 MW3.8 yrs55.1
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs54.8
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs54.8
TSF CO., INC. (OTHER METAL VALVE AND PIPE FITTING MANUFACTURING)Manufacturing——3.5 yrs54.7
TAP139499Substation-Adjacent69 kV50 MW3.8 yrs54.5
UNKNOWN155711Substation-Adjacent69 kV50 MW3.8 yrs54.4
UNKNOWN127879Substation-Adjacent69 kV50 MW3.8 yrs54.4
UNKNOWN127875Substation-Adjacent69 kV50 MW3.8 yrs54.2
WESTECH FENCE (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs54.2

POSEY datacenter FAQ

How many datacenter sites are in POSEY?
67 scored datacenter candidate sites, averaging 53.8/100 DC Readiness.
Does POSEY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in POSEY?
FEMA's National Risk Index rates POSEY as "Relatively Moderate" (score 32).
What are industrial electricity rates in POSEY?
Average industrial electricity is 9.01¢/kWh and commercial is 13.52¢/kWh in POSEY.