Datacenter Sites in POSEY, Indiana

POSEY has 67 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 1,000 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

POSEY, Indiana has 67 scored datacenter candidate sites averaging 54.8/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 40th of 91 Indiana counties by number of sites and 20th by average score. The top-scoring site is EC Near A B Brown · eaa2d572 at 62.0/100.

67
Candidate sites
54.8/100
Avg DC Readiness
1,000 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in POSEY

Site-selection context for POSEY

Yessales_tax_exemption
Datacenter tax incentive
13.52¢/kWh
Commercial electricity
9.01¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$7,200
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does POSEY compare with other counties in Indiana?

By number of scored sites, POSEY ranks 40th of the 91 Indiana counties with a county page, holding 0.8% of the state's 8,629 sites. Its average DC Readiness of 54.8/100 ranks 20th in the state and is roughly in line with the national average of 53.0. Nationally it has the 549th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 34 score 55 or higher.

What types of datacenter sites are in POSEY?

Greenfield sites are the most common (24, 36% of the county's inventory), followed by manufacturing (19) and substation-adjacent (17). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in POSEY?

Industrial electricity averages 9.01¢/kWh and commercial 13.52¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $7,200 an acre.

By site type

Top datacenter sites in POSEY

Top datacenter sites in POSEY
SiteTypeVoltageCapacityQueue waitScore
EC Near A B BrownGreenfield——3.0 yrs62.0
EC Near A B BrownGreenfield——3.0 yrs60.5
EC Coal Posey CountyGreenfield——3.0 yrs60.3
EC Coal Posey CountyGreenfield——3.0 yrs60.0
UNKNOWN127881Substation-Adjacent138 kV100 MW3.0 yrs59.9
EC Near A B BrownGreenfield——3.0 yrs59.9
EC Coal Posey CountyGreenfield——3.0 yrs59.6
EC Near A B BrownGreenfield——3.0 yrs59.0
EC Near A B BrownGreenfield——3.0 yrs59.0
EC Coal Posey CountyGreenfield——3.0 yrs58.9
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs58.5
EC Near A B BrownGreenfield——3.0 yrs58.5
UNKNOWN127862Substation-Adjacent138 kV100 MW3.0 yrs58.5
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs58.5
UNKNOWN127564Substation-Adjacent138 kV100 MW3.0 yrs58.4
EC Coal Posey CountyGreenfield——3.0 yrs58.2
WADESVILLESubstation-Adjacent69 kV50 MW3.0 yrs56.9
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs56.4
EC Near SABIC Innovative Plastics Mt. VernonGreenfield——3.0 yrs56.4
UNKNOWN127879Substation-Adjacent69 kV50 MW3.0 yrs56.3
TAP139499Substation-Adjacent69 kV50 MW3.0 yrs56.3
UNKNOWN155711Substation-Adjacent69 kV50 MW3.0 yrs56.2
TAP139501Substation-Adjacent69 kV50 MW3.0 yrs56.1
UNKNOWN127875Substation-Adjacent69 kV50 MW3.0 yrs56.0
UNKNOWN127874Substation-Adjacent69 kV50 MW3.0 yrs55.8

Every scored site in POSEY

All 67 sites, best first.

POSEY datacenter FAQ

How many datacenter sites are in POSEY?

67 scored datacenter candidate sites, averaging 54.8/100 DC Readiness. That is the 40th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in POSEY?

EC Near A B Brown · eaa2d572 scores 62.0/100 DC Readiness, the highest of the 67 scored sites in POSEY (a greenfield site).

Does POSEY offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in POSEY?

FEMA's National Risk Index rates POSEY as "Relatively Moderate" (score 32).

What are industrial electricity rates in POSEY?

Average industrial electricity is 9.01¢/kWh and commercial is 13.52¢/kWh in POSEY.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in POSEY, Indiana”, https://gridcensus.com/datacenter-sites/indiana/posey (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for POSEY, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.