American Legion Post No. 5 is a industrial datacenter candidate site in POSEY, Indiana, interconnecting through PJM. It screens at 43.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth56

Connectivity

Nearest IXPSITCO Evansville
IXP distance21.2 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterSITCO Evansville
DC distance21.2 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.52¢/kWh
Industrial electricity9.01¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,200

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
62
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in POSEY, ranked by DC Readiness.

Sites near American Legion Post No. 5
SiteTypeVoltageCapacityQueue waitScore
A B BrownBrownfield530 MW74.4
BROWN (345 KV)Substation-Adjacent345 kV600 MW4.6 yrs72.4
UNKNOWN127566Substation-Adjacent138 kV100 MW4.6 yrs67.7
UNKNOWN127881Substation-Adjacent138 kV100 MW4.6 yrs66.7
UNKNOWN127862Substation-Adjacent138 kV100 MW4.6 yrs66.7
UNKNOWN127564Substation-Adjacent138 kV100 MW4.6 yrs65.5
Greenfield (BROWN (345 KV) - GIBSON STATIO)Greenfield345 kV600 MW4.6 yrs65.0
SABIC Innovative Plastics Mt. VernonBrownfield6 MW64.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for American Legion Post No. 5, POSEY. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.