Datacenter Sites in PERRY, Indiana
PERRY has 44 scored datacenter candidate sites averaging 52.1/100 DC Readiness, with a catalogued aggregate of 400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
PERRY, Indiana has 44 scored datacenter candidate sites averaging 52.1/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 60th of 91 Indiana counties by number of sites and 72nd by average score. The top-scoring site is Substation-Adjacent site · 3d333d37 at 58.0/100.
Site-selection context for PERRY
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
How does PERRY compare with other counties in Indiana?
By number of scored sites, PERRY ranks 60th of the 91 Indiana counties with a county page, holding 0.5% of the state's 8,629 sites. Its average DC Readiness of 52.1/100 ranks 72nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 868th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.
What types of datacenter sites are in PERRY?
Manufacturing sites are the most common (16, 36% of the county's inventory), followed by industrial (15) and substation-adjacent (6). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in PERRY?
Industrial electricity averages 8.32¢/kWh and commercial 13.49¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $5,209 an acre.
By site type
Top datacenter sites in PERRY
Every scored site in PERRY
All 44 sites, best first.
- Substation-Adjacent site · 3d333d37 · 58.0
- Substation-Adjacent site · ef8c1459 · 57.3
- EC Coal Perry County · b7dc7301 · 57.0
- OZ Perry · 56.6
- Substation-Adjacent site · f252a758 · 55.2
- Substation-Adjacent site · 5ec4ec6c · 55.1
- Substation-Adjacent site · d7d8d5a5 · 55.1
- Substation-Adjacent site · fbc5a2ff · 54.2
- EC Coal Perry County · fe809424 · 51.8
- CAN-CLAY CORP. (FABRICATED PIPE AND PIPE FITTING MANUFACTURING) · 51.3
- NEWS PUBLISHING CO., INC. (OTHER COMMERCIAL PRINTING) · 51.3
- SWISS PLYWOOD CORP. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING) · 51.3
- BEBCO HARDWOODS, INC. (SAWMILLS) · 51.3
- Tell City Chair Company · 51.3
- SCHWAB CORP. (OFFICE FURNITURE (EXCEPT WOOD) MANUFACTURING) · 51.3
- Old Swiss Plywood · 51.3
- Commercial Property · 51.3
- Abandoned Building · 51.3
- STEWART WARNER SOUTH WIND CORP. (OTHER GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING) · 51.3
- Can Clay Facility · 51.3
- Cannelton Annex Building · 51.3
- CONSOLIDATED RECYCLING CO., INC. (ALL OTHER PETROLEUM AND COAL PRODUCTS MANUFACTURING) · 51.3
- Mullen Apartment Property · 51.3
- WILLIAM TELL WOODCRAFTERS, INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING) · 51.3
- TELL CITY CONCRETE SUPPLY CO. (READY-MIX CONCRETE MANUFACTURING) · 51.3
- Mine Site · a02234d1 · 51.3
- MULZER CRUSHED STONE, INC. (H Q) (NOT AVAILABLE) · 51.3
- SIRS INDUSTRIES, PLT. 3 (WOOD CONTAINER AND PALLET MANUFACTURING) · 51.3
- TELL CITY CHAIR COMPANY (NOT AVAILABLE) · 51.3
- THYSSENKRUPP-WAUPACA FOUNDRY (IRON FOUNDRIES) · 51.3
- PARKER HANNIFIN CORP. (ALL OTHER MISCELLANEOUS GENERAL PURPOSE MACHINERY MANUFACTURING) · 51.3
- Cannelton Gymnasium · 51.3
- Maxon Marine Industries · 51.3
- Bruce Property · 51.3
- Old Rome Courthouse · 51.3
- BEST CHAIRS, INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING) · 51.3
- Storage Building for River City Recycling · 51.2
- Former National Guard Armory · 51.2
- River City Recycling II · 51.2
- Lincoln Hills Recycling Center · 51.2
- Mine Site · e2f9d4a9 · 50.8
- Mine Site · 507be1ba · 50.7
- ETIENNE'S TIMBER HARVEST, PHIL (CUT STOCK, RESAWING LUMBER, AND PLANING) · 50.7
- Mine Site · e9434d9e · 50.6
PERRY datacenter FAQ
How many datacenter sites are in PERRY?
44 scored datacenter candidate sites, averaging 52.1/100 DC Readiness. That is the 60th-most of 91 Indiana counties with five or more sites.
What is the highest-scoring datacenter site in PERRY?
Substation-Adjacent site · 3d333d37 scores 58.0/100 DC Readiness, the highest of the 44 scored sites in PERRY (a substation-adjacent site).
Does PERRY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in PERRY?
FEMA's National Risk Index rates PERRY as "Relatively Moderate" (score 32).
What are industrial electricity rates in PERRY?
Average industrial electricity is 8.32¢/kWh and commercial is 13.49¢/kWh in PERRY.
More in Indiana
- All datacenter sites in Indiana· 8,629 sites
- Operating datacenters in Indiana
- Electric substations in Indiana
- MARION· 900 sites · avg 56.1
- ELKHART· 771 sites · avg 53.1
- Lake County· 419 sites · avg 53.7
- ALLEN· 415 sites · avg 53.8
- ST JOSEPH· 316 sites · avg 54.1
- Vanderburgh County· 251 sites · avg 56.8
- Manufacturing sites in Indiana
- Industrial sites in Indiana
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in PERRY, Indiana”, https://gridcensus.com/datacenter-sites/indiana/perry (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for PERRY, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.