OZ Perry

Greenfield

PERRY, Indiana · PJM

DC Readiness
56.4
Good / 100

OZ Perry is a greenfield datacenter candidate site in PERRY, Indiana, interconnecting through PJM. It screens at 56.4/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPSITCO Evansville
IXP distance44.5 mi
Fiber providers3
Fiber coverage85.1%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance244.1 mi

Site characteristics

Site typeGreenfield
Land contactPerry County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score68/100
Construction cost index84.3 (avg 100)

Location context

Nearest datacenterSITCO Evansville
DC distance44.5 mi
Nearest rail2.3 mi
Nearest gas pipeline2.1 mi
Nearest fiber route143.4 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.49¢/kWh
Industrial electricity8.32¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,209

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
35
Fiber connectivity12%
71
Energy cost10%
83
Water risk8%
90
Natural hazard8%
68
Buildability7%
45
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
80
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in PERRY, ranked by DC Readiness.

Sites near OZ Perry
SiteTypeVoltageCapacityQueue waitScore
EC Coal Perry CountyGreenfield3.0 yrs56.7
UNKNOWN127803Substation-Adjacent161 kV100 MW3.8 yrs53.8
UNKNOWN127804Substation-Adjacent161 kV100 MW3.8 yrs53.8
NEWS PUBLISHING CO., INC. (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs53.2
THYSSENKRUPP-WAUPACA FOUNDRY (IRON FOUNDRIES)Manufacturing3.5 yrs53.2
STEWART WARNER SOUTH WIND CORP. (OTHER GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs53.2
CONSOLIDATED RECYCLING CO., INC. (ALL OTHER PETROLEUM AND COAL PRODUCTS MANUFACTURING)Manufacturing3.5 yrs53.2
TELL CITY CONCRETE SUPPLY CO. (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs53.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Perry, PERRY. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.