ETIENNE'S TIMBER HARVEST, PHIL (CUT STOCK, RESAWING LUMBER, AND PLANING)

Manufacturing

PERRY, Indiana

DC Readiness
48.5
Fair / 100

ETIENNE'S TIMBER HARVEST, PHIL (CUT STOCK, RESAWING LUMBER, AND PLANING) is a manufacturing datacenter candidate site in PERRY, Indiana. It screens at 48.5/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPHeyburn Building
IXP distance44.9 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterHeyburn Building
DC distance44.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.49¢/kWh
Industrial electricity8.32¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,209

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
32
Energy cost10%
50
Water risk8%
90
Natural hazard8%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in PERRY, ranked by DC Readiness.

Sites near ETIENNE'S TIMBER HARVEST, PHIL (CUT STOCK, RESAWING LUMBER, AND PLANING)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (JEFFERSON - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs68.8
Greenfield (JEFFERSON - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs66.6
UNKNOWN127803Substation-Adjacent161 kV100 MW3.0 yrs64.2
UNKNOWN127804Substation-Adjacent161 kV100 MW3.0 yrs61.2
Greenfield (UNKNOWN127803 - UNKNOWN127804)Greenfield161 kV100 MW3.0 yrs58.5
EC Coal Perry CountyGreenfield3.0 yrs56.8
Greenfield (UNKNOWN127789 - UNKNOWN127804)Greenfield161 kV100 MW3.0 yrs56.5
OZ PerryGreenfield3.0 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ETIENNE'S TIMBER HARVEST, PHIL (CUT STOCK, RESAWING LUMBER, AND PLANING), PERRY. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.