Datacenter Sites in CLARK, Indiana

CLARK has 172 scored datacenter candidate sites averaging 53.5/100 DC Readiness, with a catalogued aggregate of 3,304 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

172
Candidate sites
53.5/100
Avg DC Readiness
3,304 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for CLARK

Yessales_tax_exemption
Datacenter tax incentive
11.50¢/kWh
Commercial electricity
9.88¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$6,194
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in CLARK

Top datacenter sites in CLARK
SiteTypeVoltageCapacityQueue waitScore
NORTHSIDESubstation-Adjacent345 kV600 MW3.0 yrs71.9
SPEEDSubstation-Adjacent345 kV600 MW3.0 yrs71.7
UNKNOWN155611Substation-Adjacent138 kV100 MW3.0 yrs67.8
Greenfield (SPEED - TRIMBLE COUNTY STATION)Greenfield345 kV600 MW3.0 yrs66.8
UNKNOWN125382Substation-Adjacent138 kV100 MW3.0 yrs66.7
UNKNOWN157701Substation-Adjacent138 kV100 MW3.0 yrs65.8
TAP156012Substation-Adjacent138 kV100 MW3.0 yrs63.4
Greenfield (SPEED - TRIMBLE COUNTY STATION)Greenfield345 kV600 MW3.0 yrs63.1
UNKNOWN125328Substation-Adjacent138 kV100 MW3.0 yrs62.3
Greenfield (NORTHSIDE - BEARGRASS)Greenfield138 kV100 MW3.0 yrs60.1
Clark-Floyd Landfill Gas GeneratingBrownfield4 MW3.0 yrs59.4
Greenfield (UNKNOWN125328 - TAP156012)Greenfield138 kV100 MW3.0 yrs59.0
EC Near Clark-Floyd Landfill Gas GeneratingGreenfield3.0 yrs58.8
EC Near Clark-Floyd Landfill Gas GeneratingGreenfield3.0 yrs57.9
CARMAN INDUSTRIES, INC. (MACHINE SHOPS)Manufacturing57.6
EVENING NEWS, THE (OTHER COMMERCIAL PRINTING)Manufacturing57.5
P Q CORP. (PLASTICS MATERIAL AND RESIN MANUFACTURING)Manufacturing57.5
JEFFERSON YACHTS, INC. (BOAT BUILDING)Manufacturing57.5
JEFFBOAT, LLC (BOAT BUILDING)Manufacturing57.4
PFAU'S SONS CO., INC., GEORGE (RENDERING AND MEAT BYPRODUCT PROCESSING)Manufacturing57.4
BOWLES MATTRESS CO., INC. (MATTRESS MANUFACTURING)Manufacturing57.3
HI TECH VENEER (HARDWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing57.3
RO-VIC WOOD PRODUCTS (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing57.3
ALTEC, LLC (OTHER ALUMINUM ROLLING AND DRAWING)Manufacturing57.3
KOETTER WOODWORKING, INC. (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing57.3

CLARK datacenter FAQ

How many datacenter sites are in CLARK?
172 scored datacenter candidate sites, averaging 53.5/100 DC Readiness.
Does CLARK offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in CLARK?
FEMA's National Risk Index rates CLARK as "Relatively Moderate" (score 32).
What are industrial electricity rates in CLARK?
Average industrial electricity is 9.88¢/kWh and commercial is 11.50¢/kWh in CLARK.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLARK, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.