Skip to content
Gridcensus

EC Near Clark-Floyd Landfill Gas Generating

Greenfield

CLARK, Indiana · PJM

DC Readiness
57.3
Good / 100

EC Near Clark-Floyd Landfill Gas Generating is a greenfield datacenter candidate site in CLARK, Indiana, interconnecting through PJM. It screens at 57.3/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.2 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPHeyburn Building
IXP distance18.9 mi
Fiber providers7
Fiber coverage60.4%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance178.0 mi

Site characteristics

Site typeGreenfield
Land contactClark County Assessor
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score68/100
Construction cost index94.6 (avg 100)

Location context

Nearest datacenterHeyburn Building
DC distance18.9 mi
Nearest rail0.6 mi
Nearest gas pipeline20.0 mi
Nearest fiber route98.6 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.50¢/kWh
Industrial electricity9.88¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,194

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Clark-Floyd Landfill Gas Generating

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
39
Fiber connectivity12%
75
Energy cost10%
83
Water risk7%
91
Natural hazard6%
68
Buildability7%
75
Labor market4%
50
DC cluster4%
65
Land / acreage3%
42
Construction cost3%
71
Gas pipeline2%
36
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in CLARK, ranked by DC Readiness.

Sites near EC Near Clark-Floyd Landfill Gas Generating
SiteTypeVoltageCapacityQueue waitScore
NORTHSIDESubstation-Adjacent345 kV600 MW3.8 yrs64.8
SPEEDSubstation-Adjacent345 kV600 MW3.8 yrs64.3
UNKNOWN155611Substation-Adjacent138 kV100 MW3.8 yrs59.0
UNKNOWN157701Substation-Adjacent138 kV100 MW3.8 yrs58.7
UNKNOWN125382Substation-Adjacent138 kV100 MW3.8 yrs58.5
TAP156012Substation-Adjacent138 kV100 MW3.8 yrs58.1
Clark-Floyd Landfill Gas GeneratingBrownfield—4 MW3.0 yrs57.9
UNKNOWN125328Substation-Adjacent138 kV100 MW3.8 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen