Skip to content
Gridcensus

CLARK, Indiana · PJM

DC Readiness
64.8
Good / 100

NORTHSIDE is a substation-adjacent datacenter candidate site in CLARK, Indiana, interconnecting through PJM. It screens at 64.8/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationNORTHSIDE
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPHeyburn Building
IXP distance8.0 mi
Fiber providers7
Fiber coverage60.4%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterHeyburn Building
DC distance8.0 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.50¢/kWh
Industrial electricity9.88¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,194

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
33
Fiber connectivity12%
74
Energy cost10%
50
Water risk8%
90
Natural hazard8%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in CLARK, ranked by DC Readiness.

Sites near NORTHSIDE
SiteTypeVoltageCapacityQueue waitScore
SPEEDSubstation-Adjacent345 kV600 MW3.8 yrs63.6
Clark-Floyd Landfill Gas GeneratingBrownfield4 MW3.0 yrs59.8
UNKNOWN155611Substation-Adjacent138 kV100 MW3.8 yrs59.0
EC Near Clark-Floyd Landfill Gas GeneratingGreenfield3.0 yrs58.7
UNKNOWN125382Substation-Adjacent138 kV100 MW3.8 yrs58.3
UNKNOWN157701Substation-Adjacent138 kV100 MW3.8 yrs58.2
P Q CORP. (PLASTICS MATERIAL AND RESIN MANUFACTURING)Manufacturing3.5 yrs57.8
EC Near Clark-Floyd Landfill Gas GeneratingGreenfield3.0 yrs57.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTHSIDE, CLARK. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.