Datacenter Sites in Suwannee, Florida
Suwannee has 37 scored datacenter candidate sites averaging 53.8/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
At a glance
Suwannee, Florida has 37 scored datacenter candidate sites averaging 53.8/100 DC Readiness, roughly in line with the Florida average of 56.0. It ranks 32nd of 66 Florida counties by number of sites and 44th by average score. The top-scoring site is EC Near Suwannee River · bfd44f72 at 59.2/100.
Site-selection context for Suwannee
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
How does Suwannee compare with other counties in Florida?
By number of scored sites, Suwannee ranks 32nd of the 66 Florida counties with a county page, holding 0.9% of the state's 4,344 sites. Its average DC Readiness of 53.8/100 ranks 44th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1044th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 14 score 55 or higher.
What types of datacenter sites are in Suwannee?
Greenfield sites are the most common (14, 38% of the county's inventory), followed by industrial (14) and substation-adjacent (6). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Suwannee?
Industrial electricity averages 7.83¢/kWh and commercial 12.78¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is low-medium. 6 fiber providers report service in the county. The climate runs 3,500 cooling degree days a year with a mean temperature of 72°F. Land is valued around $6,499 an acre.
By site type
Top datacenter sites in Suwannee
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 59.2 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 58.9 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 58.6 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 58.3 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 58.0 |
| LIVE OAK | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 57.6 |
| TAP143312 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 57.3 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 56.9 |
| OZ Suwannee | Greenfield | — | — | 3.7 yrs | 56.9 |
| UNKNOWN121132 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 56.9 |
| UNKNOWN121131 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 56.4 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 56.0 |
| UNKNOWN154649 | Substation-Adjacent | 69 kV | 50 MW | 3.7 yrs | 55.6 |
| Greenfield (UNKNOWN107674 - FORT WHITE) | Greenfield | 230 kV | 300 MW | 3.7 yrs | 55.1 |
| Greenfield (UNKNOWN107674 - FORT WHITE) | Greenfield | 230 kV | 300 MW | 3.7 yrs | 54.8 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 54.5 |
| UNKNOWN107673 | Substation-Adjacent | 69 kV | 50 MW | 3.7 yrs | 54.2 |
| EC Near Suwannee River | Greenfield | — | — | 3.7 yrs | 53.0 |
| 125 Court Street SE | Industrial | — | — | 3.7 yrs | 51.7 |
| 401 Georgia Avenue | Industrial | — | — | 3.7 yrs | 51.7 |
| 401 Georgia Avenue | Industrial | — | — | 3.7 yrs | 51.7 |
| 203 Haines Street NE | Industrial | — | — | 3.7 yrs | 51.7 |
| 204 Haines Street | Industrial | — | — | 3.7 yrs | 51.7 |
| 206 Haines Street NE | Industrial | — | — | 3.7 yrs | 51.7 |
| 210 Georgia Avenue NE | Industrial | — | — | 3.7 yrs | 51.7 |
Every scored site in Suwannee
All 37 sites, best first.
- EC Near Suwannee River · bfd44f72 · 59.2
- EC Near Suwannee River · c0afda7c · 58.9
- EC Near Suwannee River · a8722d88 · 58.6
- EC Near Suwannee River · 837ea586 · 58.3
- EC Near Suwannee River · 5dd068c0 · 58.0
- LIVE OAK · 57.6
- Substation-Adjacent site · 41880be7 · 57.3
- EC Near Suwannee River · 5dbeef8d · 56.9
- OZ Suwannee · 56.9
- Substation-Adjacent site · eb776a27 · 56.9
- Substation-Adjacent site · 16d6ce90 · 56.4
- EC Near Suwannee River · 1cf98543 · 56.0
- Substation-Adjacent site · 2765420a · 55.6
- Greenfield (UNKNOWN107674 - FORT WHITE) · 85410870 · 55.1
- Greenfield (UNKNOWN107674 - FORT WHITE) · 6e0ee7cc · 54.8
- EC Near Suwannee River · 319bb3a7 · 54.5
- Substation-Adjacent site · 854b980c · 54.2
- EC Near Suwannee River · 12ee7380 · 53.0
- 125 Court Street SE · 51.7
- 401 Georgia Avenue · bdffbadb · 51.7
- 401 Georgia Avenue · 4fb6cf42 · 51.7
- 203 Haines Street NE · 51.7
- 204 Haines Street · 51.7
- 206 Haines Street NE · 51.7
- 210 Georgia Avenue NE · 51.7
- 300-302 Duval Street NE · 51.7
- 324 Duval Street NE · 51.7
- 200 4th Street NW · 51.7
- 202 Georgia Avenue NE · 51.7
- 780 Cooper Street SE · 51.7
- Mine Site · 6b22279b · 51.6
- Mine Site · e0324226 · 51.5
- Greenfield (UNKNOWN107674 - None) · 50.4
- Mine Site · 79fcf6a0 · 50.1
- Greenfield (FORT WHITE - UNKNOWN176931) · 50.1
- 505 Houston Avenue NW · 49.3
- 500 Howard Street West · 49.3
Suwannee datacenter FAQ
How many datacenter sites are in Suwannee?
37 scored datacenter candidate sites, averaging 53.8/100 DC Readiness. That is the 32nd-most of 66 Florida counties with five or more sites.
What is the highest-scoring datacenter site in Suwannee?
EC Near Suwannee River · bfd44f72 scores 59.2/100 DC Readiness, the highest of the 37 scored sites in Suwannee (a greenfield site).
Does Suwannee offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Suwannee?
FEMA's National Risk Index rates Suwannee as "Very High" (score 55).
What are industrial electricity rates in Suwannee?
Average industrial electricity is 7.83¢/kWh and commercial is 12.78¢/kWh in Suwannee.
More in Florida
- All datacenter sites in Florida· 4,344 sites
- Operating datacenters in Florida
- Electric substations in Florida
- Miami-Dade County· 518 sites · avg 58.1
- Hillsborough County· 278 sites · avg 58.5
- Duval· 263 sites · avg 58.3
- Pinellas· 211 sites · avg 53.8
- Polk County· 207 sites · avg 57.1
- Orange County· 163 sites · avg 60.1
- Greenfield sites in Florida
- Industrial sites in Florida
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Suwannee, Florida”, https://gridcensus.com/datacenter-sites/florida/suwannee (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Suwannee, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.