Skip to content
Gridcensus

Datacenter Sites in Suwannee, Florida

Suwannee has 45 scored datacenter candidate sites averaging 56.6/100 DC Readiness, with a catalogued aggregate of 2,647 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

45
Candidate sites
56.6/100
Avg DC Readiness
2,647 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Suwannee

Site-selection context for Suwannee

Yessales_tax_exemption
Datacenter tax incentive
12.78¢/kWh
Commercial electricity
7.83¢/kWh
Industrial electricity
6
Fiber providers
Low-Medium
Water stress
$6,499
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

By site type

Top datacenter sites in Suwannee

Top datacenter sites in Suwannee
SiteTypeVoltageCapacityQueue waitScore
EC Near Suwannee RiverGreenfield3.6 yrs60.0
EC Near Suwannee RiverGreenfield3.6 yrs59.7
EC Near Suwannee RiverGreenfield3.6 yrs59.4
EC Near Suwannee RiverGreenfield3.6 yrs59.1
EC Near Suwannee RiverGreenfield3.6 yrs59.0
EC Near Suwannee RiverGreenfield3.6 yrs57.7
OZ SuwanneeGreenfield3.6 yrs57.7
EC Near Suwannee RiverGreenfield3.6 yrs56.9
EC Near Suwannee RiverGreenfield3.6 yrs54.8
LIVE OAKSubstation-Adjacent115 kV100 MW1.0 yrs54.8
UNKNOWN121132Substation-Adjacent115 kV100 MW1.0 yrs54.8
TAP143312Substation-Adjacent115 kV100 MW1.0 yrs54.8
EC Near Suwannee RiverGreenfield3.6 yrs53.8
UNKNOWN121131Substation-Adjacent115 kV100 MW1.0 yrs53.6
Greenfield (UNKNOWN107674 - FORT WHITE)Greenfield230 kV300 MW1.0 yrs52.9
Greenfield (UNKNOWN107674 - FORT WHITE)Greenfield230 kV300 MW1.0 yrs52.9
UNKNOWN107673Substation-Adjacent69 kV50 MW1.0 yrs52.8
UNKNOWN154649Substation-Adjacent69 kV50 MW1.0 yrs52.8
203 Haines Street NEIndustrial1.0 yrs52.6
401 Georgia AvenueIndustrial1.0 yrs52.6
210 Georgia Avenue NEIndustrial1.0 yrs52.6
206 Haines Street NEIndustrial1.0 yrs52.6
401 Georgia AvenueIndustrial1.0 yrs52.6
324 Duval Street NEIndustrial1.0 yrs52.6
200 4th Street NWIndustrial1.0 yrs52.6

Suwannee datacenter FAQ

How many datacenter sites are in Suwannee?
45 scored datacenter candidate sites, averaging 56.6/100 DC Readiness.
Does Suwannee offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Suwannee?
FEMA's National Risk Index rates Suwannee as "Very High" (score 55).
What are industrial electricity rates in Suwannee?
Average industrial electricity is 7.83¢/kWh and commercial is 12.78¢/kWh in Suwannee.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Suwannee, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.