Suwannee has 45 scored datacenter candidate sites averaging 54.9/100 DC Readiness, with a catalogued aggregate of 2,647 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

45
Candidate sites
54.9/100
Avg DC Readiness
2,647 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating

Site-selection context for Suwannee

Yessales_tax_exemption
Datacenter tax incentive
12.78¢/kWh
Commercial electricity
7.83¢/kWh
Industrial electricity
5
Fiber providers
Low-Medium
Water stress
$6,499
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

By site type

Top datacenter sites in Suwannee

Top datacenter sites in Suwannee
SiteTypeVoltageCapacityQueue waitScore
FORT WHITESubstation-Adjacent230 kV300 MW5.8 yrs70.0
UNKNOWN107674Substation-Adjacent230 kV300 MW5.8 yrs68.8
Suwannee RiverBrownfield147 MW68.3
UNKNOWN107675Substation-Adjacent115 kV100 MW3.6 yrs66.6
UNKNOWN121132Substation-Adjacent115 kV100 MW3.6 yrs65.9
TAP174787Substation-Adjacent115 kV100 MW3.6 yrs64.8
UNKNOWN121131Substation-Adjacent115 kV100 MW3.6 yrs64.5
LIVE OAKSubstation-Adjacent115 kV100 MW5.8 yrs62.4
Greenfield (UNKNOWN107674 - FORT WHITE)Greenfield230 kV300 MW5.8 yrs62.4
Greenfield (UNKNOWN107674 - FORT WHITE)Greenfield230 kV300 MW5.8 yrs61.7
TAP143312Substation-Adjacent115 kV100 MW3.6 yrs60.6
Greenfield (TAP142391 - TAP174787)Greenfield115 kV100 MW3.6 yrs59.8
EC Near Suwannee RiverGreenfield3.6 yrs58.9
EC Near Suwannee RiverGreenfield3.6 yrs58.6
Greenfield (UNKNOWN121131 - LIVE OAK)Greenfield115 kV100 MW3.6 yrs58.4
EC Near Suwannee RiverGreenfield3.6 yrs58.3
Greenfield (TAP142391 - JASPER)Greenfield115 kV100 MW5.8 yrs58.3
EC Near Suwannee RiverGreenfield3.6 yrs58.2
OZ SuwanneeGreenfield3.6 yrs57.8
EC Near Suwannee RiverGreenfield3.6 yrs56.9
Greenfield (JASPER - FORT WHITE)Greenfield115 kV100 MW5.8 yrs56.8
Greenfield (UNKNOWN107674 - LIVE OAK)Greenfield115 kV100 MW5.8 yrs56.5
EC Near Suwannee RiverGreenfield3.6 yrs56.1
Greenfield (TAP142391 - JASPER)Greenfield115 kV100 MW5.8 yrs54.7
EC Near Suwannee RiverGreenfield3.6 yrs54.1

Suwannee datacenter FAQ

How many datacenter sites are in Suwannee?
45 scored datacenter candidate sites, averaging 54.9/100 DC Readiness.
Does Suwannee offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Suwannee?
FEMA's National Risk Index rates Suwannee as "Very High" (score 55).
What are industrial electricity rates in Suwannee?
Average industrial electricity is 7.83¢/kWh and commercial is 12.78¢/kWh in Suwannee.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen