OZ Suwannee

Greenfield

Suwannee, Florida · SERC

DC Readiness
58.5
Good / 100

OZ Suwannee is a greenfield datacenter candidate site in Suwannee, Florida, interconnecting through SERC. It screens at 58.5/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.13¢/kWh
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance76.9 mi
Fiber providers6
Fiber coverage79.3%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance279.1 mi

Site characteristics

Site typeGreenfield
Land contactSuwannee County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index71.2 (avg 100)

Location context

Nearest datacenterHiPerGator
DC distance59.0 mi
Nearest rail13.0 mi
Nearest gas pipeline2.0 mi
Nearest fiber route128.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.78¢/kWh
Industrial electricity7.83¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$6,499

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Suwannee

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
74
Fiber connectivity12%
36
Energy cost10%
89
Water risk7%
75
Natural hazard6%
45
Buildability7%
90
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
91
Gas pipeline2%
94
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Suwannee, ranked by DC Readiness.

Sites near OZ Suwannee
SiteTypeVoltageCapacityQueue waitScore
EC Near Suwannee RiverGreenfield——3.6 yrs60.8
EC Near Suwannee RiverGreenfield——3.6 yrs60.5
EC Near Suwannee RiverGreenfield——3.6 yrs60.2
EC Near Suwannee RiverGreenfield——3.6 yrs60.0
EC Near Suwannee RiverGreenfield——3.6 yrs59.7
LIVE OAKSubstation-Adjacent115 kV100 MW1.0 yrs59.2
TAP143312Substation-Adjacent115 kV100 MW1.0 yrs58.8
UNKNOWN121132Substation-Adjacent115 kV100 MW1.0 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Suwannee, Suwannee. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.