Datacenter Sites in Charlotte County, Florida
Charlotte County has 21 scored datacenter candidate sites averaging 55.6/100 DC Readiness, with a catalogued aggregate of 2,800 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
At a glance
Charlotte County, Florida has 21 scored datacenter candidate sites averaging 55.6/100 DC Readiness, roughly in line with the Florida average of 56.0. It ranks 46th of 66 Florida counties by number of sites and 24th by average score. The top-scoring site is CHARLOTTE at 61.7/100.
Site-selection context for Charlotte County
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
How does Charlotte County compare with other counties in Florida?
By number of scored sites, Charlotte County ranks 46th of the 66 Florida counties with a county page, holding 0.5% of the state's 4,344 sites. Its average DC Readiness of 55.6/100 ranks 24th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1665th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 12 score 55 or higher.
What types of datacenter sites are in Charlotte County?
Substation-Adjacent sites are the most common (8, 38% of the county's inventory), followed by former mine (8) and greenfield (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Charlotte County?
Industrial electricity averages 8.44¢/kWh and commercial 11.45¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is low-medium. 9 fiber providers report service in the county. The climate runs 3,500 cooling degree days a year with a mean temperature of 72°F. Land is valued around $8,300 an acre.
By site type
Top datacenter sites in Charlotte County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CHARLOTTE | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 61.7 |
| UNKNOWN120559 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 61.6 |
| DEEPCREEK | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 61.4 |
| HERCULES | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 61.2 |
| UNKNOWN158373 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 60.9 |
| UNKNOWN108678 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 60.8 |
| PEACHLAND | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 60.5 |
| OZ Charlotte | Greenfield | — | — | 3.7 yrs | 58.3 |
| OZ Charlotte | Greenfield | — | — | 3.7 yrs | 58.0 |
| NORTH TRAIL | Substation-Adjacent | 138 kV | 100 MW | 3.7 yrs | 57.5 |
| Greenfield (CHARLOTTE - VANDOLAH) | Greenfield | 230 kV | 300 MW | 3.5 yrs | 56.0 |
| Greenfield (CHARLOTTE - UNKNOWN152762) | Greenfield | 230 kV | 300 MW | 3.5 yrs | 55.8 |
| OZ Charlotte | Greenfield | — | — | 3.7 yrs | 54.6 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 51.1 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 50.8 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 50.4 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 50.4 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 50.2 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 49.2 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 49.2 |
| Mine Site | Former Mine | — | — | 3.7 yrs | 48.7 |
Every scored site in Charlotte County
All 21 sites, best first.
- CHARLOTTE · 61.7
- Substation-Adjacent site · 666a4905 · 61.6
- DEEPCREEK · 61.4
- HERCULES · 61.2
- Substation-Adjacent site · d6268023 · 60.9
- Substation-Adjacent site · 12e2070b · 60.8
- PEACHLAND · 60.5
- OZ Charlotte · 96bee6d2 · 58.3
- OZ Charlotte · b51a4b67 · 58.0
- NORTH TRAIL · 57.5
- Greenfield (CHARLOTTE - VANDOLAH) · 56.0
- Greenfield (CHARLOTTE - UNKNOWN152762) · 55.8
- OZ Charlotte · 8d1fa590 · 54.6
- Mine Site · 7d29887d · 51.1
- Mine Site · 886a7057 · 50.8
- Mine Site · b0c89b5b · 50.4
- Mine Site · 3783b1a5 · 50.4
- Mine Site · 7cbde9d2 · 50.2
- Mine Site · 4d05a283 · 49.2
- Mine Site · 7b6354c8 · 49.2
- Mine Site · 3579927e · 48.7
Charlotte County datacenter FAQ
How many datacenter sites are in Charlotte County?
21 scored datacenter candidate sites, averaging 55.6/100 DC Readiness. That is the 46th-most of 66 Florida counties with five or more sites.
What is the highest-scoring datacenter site in Charlotte County?
CHARLOTTE scores 61.7/100 DC Readiness, the highest of the 21 scored sites in Charlotte County (a substation-adjacent site).
Does Charlotte County offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Charlotte County?
FEMA's National Risk Index rates Charlotte County as "Very High" (score 55).
What are industrial electricity rates in Charlotte County?
Average industrial electricity is 8.44¢/kWh and commercial is 11.45¢/kWh in Charlotte County.
More in Florida
- All datacenter sites in Florida· 4,344 sites
- Operating datacenters in Florida
- Electric substations in Florida
- Miami-Dade County· 518 sites · avg 58.1
- Hillsborough County· 278 sites · avg 58.5
- Duval· 263 sites · avg 58.3
- Pinellas· 211 sites · avg 53.8
- Polk County· 207 sites · avg 57.1
- Orange County· 163 sites · avg 60.1
- Substation-Adjacent sites in Florida
- Former Mine sites in Florida
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Charlotte County, Florida”, https://gridcensus.com/datacenter-sites/florida/charlotte-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Charlotte County, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.