OZ Charlotte

Greenfield

Charlotte County, Florida · SERC

DC Readiness
59.9
Good / 100

OZ Charlotte is a greenfield datacenter candidate site in Charlotte County, Florida, interconnecting through SERC. It screens at 59.9/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityFLORIDA POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 50 MWLarge Load Contract Service (LLCS, ≥50 MW) · 90% min take · 20 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPSKYLINK DATA CENTERS
IXP distance61.0 mi
Fiber providers9
Fiber coverage71.9%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance455.3 mi

Site characteristics

Site typeGreenfield
Land contactCharlotte County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCUMBERLAND FARMS 1049
Hazard sub-score35/100
Construction cost index77.0 (avg 100)

Location context

Nearest datacenterSKYLINK DATA CENTERS
DC distance61.0 mi
Nearest rail5.1 mi
Nearest gas pipeline3.9 mi
Nearest fiber route124.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.45¢/kWh
Industrial electricity8.44¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$8,300

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Charlotte

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
74
Fiber connectivity12%
46
Energy cost10%
89
Water risk7%
84
Natural hazard6%
35
Buildability7%
92
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
86
Gas pipeline2%
88
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Charlotte County, ranked by DC Readiness.

Sites near OZ Charlotte
SiteTypeVoltageCapacityQueue waitScore
CHARLOTTESubstation-Adjacent230 kV300 MW1.0 yrs63.3
UNKNOWN120559Substation-Adjacent230 kV300 MW1.0 yrs63.2
DEEPCREEKSubstation-Adjacent230 kV300 MW1.0 yrs63.0
HERCULESSubstation-Adjacent230 kV300 MW1.0 yrs62.7
UNKNOWN158373Substation-Adjacent230 kV300 MW1.0 yrs62.5
UNKNOWN108678Substation-Adjacent230 kV300 MW1.0 yrs62.3
PEACHLANDSubstation-Adjacent230 kV300 MW1.0 yrs62.0
OZ CharlotteGreenfield——3.6 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.