Datacenter Sites in Mesa, Colorado

Mesa has 136 scored datacenter candidate sites averaging 50.4/100 DC Readiness, with a catalogued aggregate of 3,075 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

136
Candidate sites
50.4/100
Avg DC Readiness
3,075 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Mesa

Site-selection context for Mesa

Yessales_tax_exemption
Datacenter tax incentive
12.75¢/kWh
Commercial electricity
9.98¢/kWh
Industrial electricity
11
Fiber providers
High
Water stress
$8,081
Land price / acre
700
Cooling degree days
6,200
Heating degree days
46°F
Mean annual temp

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

By site type

Top datacenter sites in Mesa

Top datacenter sites in Mesa
SiteTypeVoltageCapacityQueue waitScore
GRAND JUNCTIONSubstation-Adjacent345 kV600 MW6.9 yrs60.5
OZ MesaGreenfield1.7 yrs60.1
EC Coal Mesa CountyGreenfield1.7 yrs59.8
OZ MesaGreenfield1.7 yrs59.4
EC Coal Mesa CountyGreenfield1.7 yrs59.2
UINTAHSubstation-Adjacent230 kV300 MW6.9 yrs58.9
CAMEOSubstation-Adjacent230 kV300 MW6.9 yrs58.9
GRAND JUNCTION PSCSubstation-Adjacent230 kV300 MW6.9 yrs58.9
CLIFTONSubstation-Adjacent230 kV300 MW6.9 yrs58.8
HORIZONSubstation-Adjacent230 kV300 MW6.9 yrs58.8
ADOBESubstation-Adjacent230 kV300 MW6.9 yrs58.8
EC Coal Mesa CountyGreenfield1.7 yrs58.2
EC Coal Mesa CountyGreenfield1.7 yrs58.0
EC Coal Mesa CountyGreenfield1.7 yrs58.0
EC Coal Mesa CountyGreenfield1.7 yrs57.8
EC Near CameoGreenfield1.7 yrs57.6
EC Near CameoGreenfield1.7 yrs57.1
EC Coal Mesa CountyGreenfield1.7 yrs56.9
EC Coal Mesa CountyGreenfield1.7 yrs56.7
EC Near CameoGreenfield1.7 yrs56.7
EC Coal Mesa CountyGreenfield1.7 yrs56.6
EC Coal Mesa CountyGreenfield1.7 yrs56.6
OZ MesaGreenfield1.7 yrs56.5
EC Coal Mesa CountyGreenfield1.7 yrs56.4
EC Near CameoGreenfield1.7 yrs56.2

Mesa datacenter FAQ

How many datacenter sites are in Mesa?
136 scored datacenter candidate sites, averaging 50.4/100 DC Readiness.
Does Mesa offer datacenter tax incentives?
Enterprise Zone sales tax exemptions; broadband equipment tax credit.
What is the natural-hazard risk in Mesa?
FEMA's National Risk Index rates Mesa as "Relatively Moderate" (score 25).
What are industrial electricity rates in Mesa?
Average industrial electricity is 9.98¢/kWh and commercial is 12.75¢/kWh in Mesa.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mesa, Colorado. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.