Skip to content
Gridcensus

GRAND JUNCTION

Federal Excess

Mesa, Colorado · WECC

DC Readiness
46.3
Fair / 100

GRAND JUNCTION is a federal excess datacenter candidate site in Mesa, Colorado, interconnecting through WECC. It screens at 46.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityGRAND VALLEY POWERcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPSTRATA Vernal Data Center
IXP distance104.1 mi
Fiber providers11
Fiber coverage52.4%

Site characteristics

Acreage8 ac
Buildable load (est.)~3–8 MWland-based
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone D
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterStrata Networks
DC distance104.1 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.75¢/kWh
Industrial electricity9.98¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$8,081

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track GRAND JUNCTION

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
39
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Mesa, ranked by DC Readiness.

Sites near GRAND JUNCTION
SiteTypeVoltageCapacityQueue waitScore
GRAND JUNCTIONSubstation-Adjacent345 kV600 MW3.5 yrs59.2
OZ MesaGreenfield——3.5 yrs57.7
CLIFTONSubstation-Adjacent230 kV300 MW3.5 yrs57.6
GRAND JUNCTION PSCSubstation-Adjacent230 kV300 MW3.5 yrs57.6
UINTAHSubstation-Adjacent230 kV300 MW3.5 yrs57.6
CAMEOSubstation-Adjacent230 kV300 MW3.5 yrs57.6
ADOBESubstation-Adjacent230 kV300 MW3.5 yrs57.6
HORIZONSubstation-Adjacent230 kV300 MW3.5 yrs57.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for GRAND JUNCTION, Mesa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.