OZ Mesa

Greenfield

Mesa, Colorado · WECC

DC Readiness
48.4
Fair / 100

At a glance

OZ Mesa is a greenfield datacenter candidate site in Mesa, Colorado, scoring 48.4/100 DC Readiness — 42nd of 136 scored sites in the county. It sits in the WECC grid region and the GRAND VALLEY POWER service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

Utility commercial rate0.13¢/kWh
UtilityGRAND VALLEY POWERcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPSTRATA Vernal Data Center
IXP distance117.8 mi
Fiber providers11
Fiber coverage52.4%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance231.5 mi

Site characteristics

Site typeGreenfield
Land contactMesa County Assessor
Parcel APN2715-054-00-724
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index85.3 (avg 100)

Location context

Nearest datacenterStrata Networks
DC distance117.8 mi
Nearest rail12.8 mi
Nearest gas pipeline7.3 mi
Nearest fiber route140.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.75¢/kWh
Industrial electricity9.98¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$8,081

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Mesa

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does OZ Mesa compare with other sites in Mesa?

OZ Mesa ranks 42nd of 136 scored candidate sites in Mesa. Its 48.4/100 is roughly in line with the county average of 49.0. It is roughly in line with the Colorado average of 50.6 and roughly in line with the national average of 53.2.

Against the Colorado average, its strongest sub-score is water (52 vs 37) and its weakest is fiber connectivity (20 vs 62). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is OZ Mesa to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is STRATA Vernal Data Center at 117.8 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Strata Networks, 117.8 miles away.

What are the flood, water and hazard risks at OZ Mesa?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 3.20 on a 0–5 scale. No mapped wetlands are recorded on the parcel. At the county level, FEMA's National Risk Index rates Mesa "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
20
Energy cost10%
89
Water risk7%
52
Natural hazard6%
75
Buildability7%
40
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
79
Gas pipeline2%
77
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Mesa, ranked by DC Readiness.

Sites near OZ Mesa
SiteTypeVoltageCapacityQueue waitScore
GRAND JUNCTIONSubstation-Adjacent345 kV600 MW3.5 yrs59.2
OZ MesaGreenfield——3.5 yrs57.7
CLIFTONSubstation-Adjacent230 kV300 MW3.5 yrs57.6
CAMEOSubstation-Adjacent230 kV300 MW3.5 yrs57.6
UINTAHSubstation-Adjacent230 kV300 MW3.5 yrs57.6
ADOBESubstation-Adjacent230 kV300 MW3.5 yrs57.6
GRAND JUNCTION PSCSubstation-Adjacent230 kV300 MW3.5 yrs57.6
HORIZONSubstation-Adjacent230 kV300 MW3.5 yrs57.5

OZ Mesa: common questions

What is the DC Readiness score of OZ Mesa?

OZ Mesa scores 48.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 42nd of 136 scored sites in Mesa. The Mesa average is 49.0 and the Colorado average is 50.6.

Which electric utility serves OZ Mesa?

GRAND VALLEY POWER (cooperative) holds the retail service territory that contains the site.

What grid region is OZ Mesa in?

OZ Mesa is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

Is OZ Mesa in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns OZ Mesa?

Parcel records list the owner as Deacon Gulch Land And Cattle Company Llc (private land).

How far is OZ Mesa from an internet exchange?

The nearest internet exchange facility is STRATA Vernal Data Center, about 117.8 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “OZ Mesa, Mesa, CO”, https://gridcensus.com/datacenter-sites/colorado/mesa/oz-mesa-fe408a40 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Mesa, Mesa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.