Grand Valley at 39.118, -108.346
Federal ExcessMesa, Colorado · WECC
At a glance
Grand Valley at 39.118, -108.346 is a federal excess datacenter candidate site in Mesa, Colorado, scoring 46.9/100 DC Readiness — 78th of 136 scored sites in the county. It sits in the WECC grid region and the PUBLIC SERVICE CO OF COLORADO service territory, where interconnection has averaged 3.5 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.
Site location
Get alerts
Track GRAND VALLEY
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Grand Valley at 39.118, -108.346 compare with other sites in Mesa?
Grand Valley at 39.118, -108.346 ranks 78th of 136 scored candidate sites in Mesa. Its 46.9/100 is roughly in line with the county average of 49.0. It is roughly in line with the Colorado average of 50.6 and about 12% below the national average of 53.2.
Against the Colorado average, its strongest sub-score is fiber connectivity (65 vs 62) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Grand Valley at 39.118, -108.346 to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is STRATA Vernal Data Center at 111.8 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Strata Networks, 111.8 miles away.
What are the flood, water and hazard risks at Grand Valley at 39.118, -108.346?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Mesa "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Mesa, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| GRAND JUNCTION | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 59.2 |
| OZ Mesa | Greenfield | — | — | 3.5 yrs | 57.7 |
| CLIFTON | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 57.6 |
| CAMEO | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 57.6 |
| UINTAH | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 57.6 |
| ADOBE | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 57.6 |
| GRAND JUNCTION PSC | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 57.6 |
| HORIZON | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 57.5 |
Grand Valley at 39.118, -108.346: common questions
What is the DC Readiness score of Grand Valley at 39.118, -108.346?
Grand Valley at 39.118, -108.346 scores 46.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 78th of 136 scored sites in Mesa. The Mesa average is 49.0 and the Colorado average is 50.6.
Which electric utility serves Grand Valley at 39.118, -108.346?
PUBLIC SERVICE CO OF COLORADO (investor owned) holds the retail service territory that contains the site; its holding company is XCEL ENERGY.
What grid region is Grand Valley at 39.118, -108.346 in?
Grand Valley at 39.118, -108.346 is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.
Is Grand Valley at 39.118, -108.346 in a flood zone?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).
How far is Grand Valley at 39.118, -108.346 from an internet exchange?
The nearest internet exchange facility is STRATA Vernal Data Center, about 111.8 miles away; 11 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Grand Valley at 39.118, -108.346, Mesa, CO”, https://gridcensus.com/datacenter-sites/colorado/mesa/grand-valley-08f1502b (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Grand Valley at 39.118, -108.346, Mesa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.