Datacenter Sites in Vilas, Wisconsin

Vilas has 34 scored datacenter candidate sites averaging 50.9/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

34
Candidate sites
50.9/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Vilas

Site-selection context for Vilas

Yessales_tax_exemption
Datacenter tax incentive
11.88¢/kWh
Commercial electricity
7.97¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$6,174
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

By site type

Top datacenter sites in Vilas

Top datacenter sites in Vilas
SiteTypeVoltageCapacityQueue waitScore
EC Near Eagle RiverGreenfield1.4 yrs57.3
EC Near Eagle RiverGreenfield1.4 yrs56.2
UNKNOWN171267Substation-Adjacent115 kV100 MW2.8 yrs55.5
EAGLE RIVERSubstation-Adjacent115 kV100 MW2.8 yrs55.4
ST GERMAINSubstation-Adjacent115 kV100 MW2.8 yrs55.2
RISER139529Substation-Adjacent115 kV100 MW2.8 yrs54.8
EC Near Eagle RiverGreenfield1.4 yrs54.6
TWIN LAKESubstation-Adjacent138 kV100 MW2.8 yrs52.8
LAKOTA ROADSubstation-Adjacent138 kV100 MW2.8 yrs52.8
EC Near Eagle RiverGreenfield1.4 yrs52.5
EC Near Eagle RiverGreenfield1.4 yrs52.1
EC Near Eagle RiverGreenfield1.4 yrs51.8
OZ VilasGreenfield1.4 yrs51.8
EC Near Eagle RiverGreenfield1.4 yrs51.6
EC Near Eagle RiverGreenfield1.4 yrs51.5
EC Near Eagle RiverGreenfield1.4 yrs50.5
EC Near Eagle RiverGreenfield1.4 yrs50.1
Highway 70 Fireworks StandIndustrial2.8 yrs49.2
Former Patterson PropertyIndustrial2.8 yrs49.2
Clear Lake JunkyardIndustrial2.8 yrs49.1
Highway 47 Salvage YardIndustrial2.8 yrs49.0
LAND O LAKESSubstation-Adjacent69 kV50 MW3.8 yrs49.0
WATERSMEETSubstation-Adjacent69 kV50 MW3.8 yrs49.0
Reservation Line Lake Trail, Tire Dump Site #3Industrial2.8 yrs49.0
Balko Trailer/Jump River ElectricIndustrial2.8 yrs49.0

Vilas datacenter FAQ

How many datacenter sites are in Vilas?
34 scored datacenter candidate sites, averaging 50.9/100 DC Readiness.
Does Vilas offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Vilas?
FEMA's National Risk Index rates Vilas as "Relatively Low" (score 22).
What are industrial electricity rates in Vilas?
Average industrial electricity is 7.97¢/kWh and commercial is 11.88¢/kWh in Vilas.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Vilas, Wisconsin. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.