Datacenter Sites in Juneau, Wisconsin
Juneau has 18 scored datacenter candidate sites averaging 56.1/100 DC Readiness, with a catalogued aggregate of 316 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
18
Candidate sites
56.1/100
Avg DC Readiness
316 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
Site-selection context for Juneau
Yessales_tax_exemption
Datacenter tax incentive
12.86¢/kWh
Commercial electricity
8.87¢/kWh
Industrial electricity
11
Fiber providers
Low
Water stress
$4,941
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
By site type
Top datacenter sites in Juneau
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 63.1 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 60.4 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 60.1 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 58.9 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 58.7 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 58.1 |
| PETENWELL | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 57.8 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 57.4 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 56.7 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 55.6 |
| LYNDON STATION | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 55.5 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 55.2 |
| EC Near Juneau | Greenfield | — | — | 1.4 yrs | 54.8 |
| UNKNOWN132907 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| WONEWOC | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| NECEDAH | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| TAP158744 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| TAP158680 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| TAP158681 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| DPC ELROY | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| DPC ELROY | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| TAP158749 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| TAP158677 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| TAP158757 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| HILLTOP (ALTE) | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
Juneau datacenter FAQ
- How many datacenter sites are in Juneau?
- 18 scored datacenter candidate sites, averaging 56.1/100 DC Readiness.
- Does Juneau offer datacenter tax incentives?
- Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
- What is the natural-hazard risk in Juneau?
- FEMA's National Risk Index rates Juneau as "Relatively Low" (score 22).
- What are industrial electricity rates in Juneau?
- Average industrial electricity is 8.87¢/kWh and commercial is 12.86¢/kWh in Juneau.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Juneau, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.