Skip to content
Gridcensus

Datacenter Sites in Juneau, Wisconsin

Juneau has 39 scored datacenter candidate sites averaging 56.0/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

39
Candidate sites
56.0/100
Avg DC Readiness
1,300 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Juneau

Site-selection context for Juneau

Yessales_tax_exemption
Datacenter tax incentive
12.86¢/kWh
Commercial electricity
8.87¢/kWh
Industrial electricity
11
Fiber providers
Low
Water stress
$4,941
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

By site type

Top datacenter sites in Juneau

Top datacenter sites in Juneau
SiteTypeVoltageCapacityQueue waitScore
EC Near JuneauGreenfield——1.4 yrs61.4
PETENWELLSubstation-Adjacent138 kV100 MW2.8 yrs59.5
EC Near JuneauGreenfield——1.4 yrs58.8
EC Near JuneauGreenfield——1.4 yrs58.6
EC Near JuneauGreenfield——1.4 yrs57.6
LYNDON STATIONSubstation-Adjacent69 kV50 MW2.8 yrs57.4
EC Near JuneauGreenfield——1.4 yrs57.1
EC Near JuneauGreenfield——1.4 yrs57.0
NECEDAHSubstation-Adjacent69 kV50 MW2.8 yrs56.8
WEST MAUSTONSubstation-Adjacent69 kV50 MW2.8 yrs56.8
TAP158681Substation-Adjacent69 kV50 MW2.8 yrs56.8
TAP158757Substation-Adjacent69 kV50 MW2.8 yrs56.8
UNKNOWN132907Substation-Adjacent69 kV50 MW2.8 yrs56.8
UNKNOWN158756Substation-Adjacent69 kV50 MW2.8 yrs56.8
DPC WHISTLING WINGSSubstation-Adjacent69 kV50 MW2.8 yrs56.8
TAP158680Substation-Adjacent69 kV50 MW2.8 yrs56.8
TAP158753Substation-Adjacent69 kV50 MW2.8 yrs56.7
HILLTOP (ALTE)Substation-Adjacent69 kV50 MW2.8 yrs56.7
ACEC DELLWOODSubstation-Adjacent69 kV50 MW2.8 yrs56.7
TAP158677Substation-Adjacent69 kV50 MW2.8 yrs56.5
EC Near JuneauGreenfield——1.4 yrs56.2
CASTLE ROCKSubstation-Adjacent69 kV50 MW2.8 yrs56.2
DPC BUCKHORNSubstation-Adjacent69 kV50 MW2.8 yrs56.2
TAP158749Substation-Adjacent69 kV50 MW2.8 yrs56.2
DPC ELROYSubstation-Adjacent69 kV50 MW2.8 yrs56.0

Juneau datacenter FAQ

How many datacenter sites are in Juneau?
39 scored datacenter candidate sites, averaging 56.0/100 DC Readiness.
Does Juneau offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Juneau?
FEMA's National Risk Index rates Juneau as "Relatively Low" (score 22).
What are industrial electricity rates in Juneau?
Average industrial electricity is 8.87¢/kWh and commercial is 12.86¢/kWh in Juneau.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Juneau, Wisconsin. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.