Skip to content
Gridcensus

Datacenter Sites in Pleasants, West Virginia

Pleasants has 20 scored datacenter candidate sites averaging 53.7/100 DC Readiness, with a catalogued aggregate of 1,700 MW. FEMA rates local natural-hazard risk as "Relatively Low".

At a glance

Pleasants, West Virginia has 20 scored datacenter candidate sites averaging 53.7/100 DC Readiness, roughly in line with the West Virginia average of 50.0. It ranks 37th of 53 West Virginia counties by number of sites and 7th by average score. The top-scoring site is BELMONT at 62.3/100.

20
Candidate sites
53.7/100
Avg DC Readiness
1,700 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 20 in Pleasants

Site-selection context for Pleasants

No
Datacenter tax incentive
10.92¢/kWh
Commercial electricity
7.71¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,209
Land price / acre
800
Cooling degree days
5,000
Heating degree days
52°F
Mean annual temp

How does Pleasants compare with other counties in West Virginia?

By number of scored sites, Pleasants ranks 37th of the 53 West Virginia counties with a county page, holding 0.5% of the state's 3,734 sites. Its average DC Readiness of 53.7/100 ranks 7th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1729th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.

What types of datacenter sites are in Pleasants?

Greenfield sites are the most common (11, 55% of the county's inventory), followed by substation-adjacent (8) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Pleasants?

Industrial electricity averages 7.71¢/kWh and commercial 10.92¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (22). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 800 cooling degree days a year with a mean temperature of 52°F. Land is valued around $3,209 an acre.

By site type

Top datacenter sites in Pleasants

Top datacenter sites in Pleasants
SiteTypeVoltageCapacityQueue waitScore
BELMONTSubstation-Adjacent765 kV1,000 MW3.0 yrs62.3
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs56.8
UNKNOWN129029Substation-Adjacent138 kV100 MW3.0 yrs56.5
EC Coal Pleasants CountyGreenfield——3.0 yrs54.2
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs54.0
UNKNOWN129171Substation-Adjacent138 kV100 MW3.0 yrs54.0
UNKNOWN108756Substation-Adjacent138 kV100 MW3.0 yrs54.0
UNKNOWN129032Substation-Adjacent138 kV100 MW3.0 yrs54.0
TAP140072Substation-Adjacent138 kV100 MW3.0 yrs54.0
UNKNOWN129031Substation-Adjacent138 kV100 MW3.0 yrs54.0
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs54.0
EC FFE Pleasants CountyGreenfield——3.0 yrs53.5
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs53.4
TAP140073Substation-Adjacent138 kV100 MW3.0 yrs53.3
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs53.2
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs52.9
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs52.9
EC Coal Pleasants CountyGreenfield——3.0 yrs52.6
EC Near FirstEnergy Willow IslandGreenfield——3.0 yrs48.2
Mine SiteFormer Mine——3.0 yrs47.1

Every scored site in Pleasants

All 20 sites, best first.

Pleasants datacenter FAQ

How many datacenter sites are in Pleasants?

20 scored datacenter candidate sites, averaging 53.7/100 DC Readiness. That is the 37th-most of 53 West Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Pleasants?

BELMONT scores 62.3/100 DC Readiness, the highest of the 20 scored sites in Pleasants (a substation-adjacent site).

Does Pleasants offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Pleasants in the GridCensus county dataset.

What is the natural-hazard risk in Pleasants?

FEMA's National Risk Index rates Pleasants as "Relatively Low" (score 22).

What are industrial electricity rates in Pleasants?

Average industrial electricity is 7.71¢/kWh and commercial is 10.92¢/kWh in Pleasants.

More in West Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Pleasants, West Virginia”, https://gridcensus.com/datacenter-sites/west-virginia/pleasants (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Pleasants, West Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.