Skip to content
Gridcensus

Pleasants, West Virginia · PJM

DC Readiness
55.5
Good / 100

TAP140073 is a substation-adjacent datacenter candidate site in Pleasants, West Virginia, interconnecting through PJM. It screens at 55.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP140073
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth130
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCitynet Bridgeport
IXP distance54.6 mi
Fiber providers4
Fiber coverage11.6%

Site characteristics

Land contactPleasants County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterCitynet Bridgeport
DC distance54.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity10.92¢/kWh
Industrial electricity7.71¢/kWh
Cooling degree days800
Heating degree days5,000
Land price / acre$3,209

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP140073

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
51
Fiber connectivity12%
48
Energy cost10%
50
Water risk7%
92
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Pleasants, ranked by DC Readiness.

Sites near TAP140073
SiteTypeVoltageCapacityQueue waitScore
BELMONTSubstation-Adjacent765 kV1,000 MW3.8 yrs64.5
EC Near FirstEnergy Willow IslandGreenfield3.0 yrs58.8
UNKNOWN129029Substation-Adjacent138 kV100 MW3.8 yrs57.9
TAP140072Substation-Adjacent138 kV100 MW3.8 yrs56.2
UNKNOWN129031Substation-Adjacent138 kV100 MW3.8 yrs56.2
UNKNOWN129171Substation-Adjacent138 kV100 MW3.8 yrs56.2
UNKNOWN129032Substation-Adjacent138 kV100 MW3.8 yrs56.2
UNKNOWN108756Substation-Adjacent138 kV100 MW3.8 yrs56.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP140073, Pleasants. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.