Skip to content
Gridcensus

Datacenter Sites in York, Virginia

York has 29 scored datacenter candidate sites averaging 53.5/100 DC Readiness, with a catalogued aggregate of 1,000 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

York, Virginia has 29 scored datacenter candidate sites averaging 53.5/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 59th of 122 Virginia counties by number of sites and 42nd by average score. The top-scoring site is YORKTOWN at 66.5/100.

29
Candidate sites
53.5/100
Avg DC Readiness
1,000 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in York

Site-selection context for York

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$16,424
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does York compare with other counties in Virginia?

By number of scored sites, York ranks 59th of the 122 Virginia counties with a county page, holding 0.5% of the state's 5,871 sites. Its average DC Readiness of 53.5/100 ranks 42nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1305th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 5 score 55 or higher.

What types of datacenter sites are in York?

Greenfield sites are the most common (11, 38% of the county's inventory), followed by shovel-ready (9) and industrial (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in York?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $16,424 an acre.

By site type

Top datacenter sites in York

Top datacenter sites in York
SiteTypeVoltageCapacityQueue waitScore
YORKTOWNSubstation-Adjacent230 kV300 MW5.1 yrs66.5
UNKNOWN114849Substation-Adjacent230 kV300 MW5.1 yrs61.4
HAYESSubstation-Adjacent230 kV300 MW5.1 yrs60.3
EC Near YorktownGreenfield——5.1 yrs60.2
SEAFORDSubstation-Adjacent115 kV100 MW5.1 yrs57.7
EC Near YorktownGreenfield——5.1 yrs54.4
EC Coal York CountyGreenfield——5.1 yrs54.3
EC Near YorktownGreenfield——5.1 yrs53.9
EC Near YorktownGreenfield——5.1 yrs53.9
EC Coal York CountyGreenfield——5.1 yrs53.6
EC Coal York CountyGreenfield——5.1 yrs53.5
EC Near YorktownGreenfield——5.1 yrs52.6
Patriot Power ParkShovel-Ready——5.1 yrs52.2
Kiln Creek Commerce CenterShovel-Ready——5.1 yrs52.1
2420 George Washington Memorial HighwayIndustrial——5.1 yrs52.0
EC Near YorktownGreenfield——5.1 yrs52.0
Hampton Industrial PlatingIndustrial——5.1 yrs51.8
York River Commerce ParkShovel-Ready——5.1 yrs51.7
York River Virtual Shell BuildingShovel-Ready——5.1 yrs51.7
EC Near YorktownGreenfield——5.1 yrs51.5
312 Waller Mill Road (York County)Industrial——5.1 yrs51.2
4600 Mooretown RdShovel-Ready——5.1 yrs50.9
Waterfront Commercial/IndustrialShovel-Ready——5.1 yrs50.8
Kings Creek Commerce CenterShovel-Ready——5.1 yrs50.6
Perry JunctionShovel-Ready——5.1 yrs50.4

Every scored site in York

All 29 sites, best first.

York datacenter FAQ

How many datacenter sites are in York?

29 scored datacenter candidate sites, averaging 53.5/100 DC Readiness. That is the 59th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in York?

YORKTOWN scores 66.5/100 DC Readiness, the highest of the 29 scored sites in York (a substation-adjacent site).

Does York offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in York?

FEMA's National Risk Index rates York as "Relatively Moderate" (score 30).

What are industrial electricity rates in York?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in York.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in York, Virginia”, https://gridcensus.com/datacenter-sites/virginia/york (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for York, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.