Skip to content
Gridcensus

Datacenter Sites in Sussex, Virginia

Sussex has 11 scored datacenter candidate sites averaging 52.7/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Sussex, Virginia has 11 scored datacenter candidate sites averaging 52.7/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 100th of 122 Virginia counties by number of sites and 50th by average score. The top-scoring site is SAPONY at 60.7/100.

11
Candidate sites
52.7/100
Avg DC Readiness
500 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 11 in Sussex

Site-selection context for Sussex

Yessales_tax_exemption
Datacenter tax incentive
7.98¢/kWh
Commercial electricity
6.91¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$2,861
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Sussex compare with other counties in Virginia?

By number of scored sites, Sussex ranks 100th of the 122 Virginia counties with a county page, holding 0.2% of the state's 5,871 sites. Its average DC Readiness of 52.7/100 ranks 50th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2327th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.

What types of datacenter sites are in Sussex?

Shovel-Ready sites are the most common (6, 55% of the county's inventory), followed by greenfield (2) and substation-adjacent (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Sussex?

Industrial electricity averages 6.91¢/kWh and commercial 7.98¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $2,861 an acre.

By site type

Top datacenter sites in Sussex

Top datacenter sites in Sussex
SiteTypeVoltageCapacityQueue waitScore
SAPONYSubstation-Adjacent230 kV300 MW5.1 yrs60.7
OZ SussexGreenfield——5.1 yrs57.6
UNKNOWN114516Substation-Adjacent115 kV100 MW5.1 yrs56.7
Sussex Green Enterprise Park: NorthShovel-Ready——5.1 yrs51.3
Grosik SiteShovel-Ready——5.1 yrs51.2
Sussex Green Enterprise Park: SouthShovel-Ready——5.1 yrs51.2
Henry Technology Park and Commerce CenterShovel-Ready——5.1 yrs50.4
Henry Road/I-95 (Route 631) Industrial ParkShovel-Ready——5.1 yrs50.3
Greenfield (UNKNOWN114516 - TAP148236)Greenfield115 kV100 MW5.1 yrs50.3
Mason Farms (Copper Station)Shovel-Ready——5.1 yrs50.1
Mine SiteFormer Mine——5.1 yrs49.7

Every scored site in Sussex

All 11 sites, best first.

Sussex datacenter FAQ

How many datacenter sites are in Sussex?

11 scored datacenter candidate sites, averaging 52.7/100 DC Readiness. That is the 100th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Sussex?

SAPONY scores 60.7/100 DC Readiness, the highest of the 11 scored sites in Sussex (a substation-adjacent site).

Does Sussex offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Sussex?

FEMA's National Risk Index rates Sussex as "Relatively Moderate" (score 30).

What are industrial electricity rates in Sussex?

Average industrial electricity is 6.91¢/kWh and commercial is 7.98¢/kWh in Sussex.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Sussex, Virginia”, https://gridcensus.com/datacenter-sites/virginia/sussex (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Sussex, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.