Datacenter Sites in Suffolk, Virginia

Suffolk has 65 scored datacenter candidate sites averaging 52.6/100 DC Readiness, with a catalogued aggregate of 1,700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Suffolk, Virginia has 65 scored datacenter candidate sites averaging 52.6/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 21st of 122 Virginia counties by number of sites and 54th by average score. The top-scoring site is SUFFOLK at 66.5/100.

65
Candidate sites
52.6/100
Avg DC Readiness
1,700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Suffolk

Site-selection context for Suffolk

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$4,816
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Suffolk compare with other counties in Virginia?

By number of scored sites, Suffolk ranks 21st of the 122 Virginia counties with a county page, holding 1.1% of the state's 5,871 sites. Its average DC Readiness of 52.6/100 ranks 54th in the state and is roughly in line with the national average of 53.0. Nationally it has the 567th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in Suffolk?

Shovel-Ready sites are the most common (59, 91% of the county's inventory), followed by substation-adjacent (4) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Suffolk?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $4,816 an acre.

By site type

Top datacenter sites in Suffolk

Top datacenter sites in Suffolk
SiteTypeVoltageCapacityQueue waitScore
SUFFOLKSubstation-Adjacent500 kV1,000 MW5.1 yrs66.5
KINGS FORKSubstation-Adjacent230 kV300 MW5.1 yrs62.2
OAK RIDGESubstation-Adjacent230 kV300 MW5.1 yrs62.0
MYRTLESubstation-Adjacent115 kV100 MW5.1 yrs57.3
EC Coal Suffolk cityGreenfield——5.1 yrs54.5
Bridgeway Technology Center IIIShovel-Ready——5.1 yrs53.5
The Woodley Office BuildingShovel-Ready——5.1 yrs53.5
Bridgeway Technology Center IShovel-Ready——5.1 yrs53.5
Atlantic Gateway Logistics CenterShovel-Ready——5.1 yrs53.4
1965 Northgate Commerce ParkwayShovel-Ready——5.1 yrs53.4
1996 Northgate Commerce ParkwayShovel-Ready——5.1 yrs53.4
3803 Bridge RoadShovel-Ready——5.1 yrs53.1
3893 - 3895 Bridge RoadShovel-Ready——5.1 yrs53.1
Shoulders Hill RoadShovel-Ready——5.1 yrs53.1
110 Maya Way - Northgate Commerce ParkShovel-Ready——5.1 yrs53.0
Cedar Point LandShovel-Ready——5.1 yrs52.9
8848 Crittenden RoadShovel-Ready——5.1 yrs52.9
Port 460 Logistics CenterShovel-Ready——5.1 yrs52.2
1700 N. Main StreetShovel-Ready——5.1 yrs52.2
1137 Progress RoadShovel-Ready——5.1 yrs52.2
Suffolk Industrial Park - Building 6Shovel-Ready——5.1 yrs52.0
1425 Pitchkettle RoadShovel-Ready——5.1 yrs52.0
135 Philhower DriveShovel-Ready——5.1 yrs52.0
Godwin BuildingShovel-Ready——5.1 yrs52.0
Madison BuildingShovel-Ready——5.1 yrs52.0

Every scored site in Suffolk

All 65 sites, best first.

Suffolk datacenter FAQ

How many datacenter sites are in Suffolk?

65 scored datacenter candidate sites, averaging 52.6/100 DC Readiness. That is the 21st-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Suffolk?

SUFFOLK scores 66.5/100 DC Readiness, the highest of the 65 scored sites in Suffolk (a substation-adjacent site).

Does Suffolk offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Suffolk?

FEMA's National Risk Index rates Suffolk as "Relatively Moderate" (score 30).

What are industrial electricity rates in Suffolk?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Suffolk.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Suffolk, Virginia”, https://gridcensus.com/datacenter-sites/virginia/suffolk (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Suffolk, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.