Datacenter Sites in Southampton, Virginia

Southampton has 10 scored datacenter candidate sites averaging 51.3/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Southampton, Virginia has 10 scored datacenter candidate sites averaging 51.3/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 104th of 122 Virginia counties by number of sites and 82nd by average score. The top-scoring site is BOYKINS at 59.5/100.

10
Candidate sites
51.3/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 10 in Southampton

Site-selection context for Southampton

Yessales_tax_exemption
Datacenter tax incentive
5.47¢/kWh
Commercial electricity
5.25¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$3,618
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Southampton compare with other counties in Virginia?

By number of scored sites, Southampton ranks 104th of the 122 Virginia counties with a county page, holding 0.2% of the state's 5,871 sites. Its average DC Readiness of 51.3/100 ranks 82nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 2409th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 2 score 55 or higher.

What types of datacenter sites are in Southampton?

Shovel-Ready sites are the most common (8, 80% of the county's inventory), followed by substation-adjacent (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Southampton?

Industrial electricity averages 5.25¢/kWh and commercial 5.47¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $3,618 an acre.

By site type

Top datacenter sites in Southampton

Top datacenter sites in Southampton
SiteTypeVoltageCapacityQueue waitScore
BOYKINSSubstation-Adjacent230 kV300 MW5.1 yrs59.5
TAP148239Substation-Adjacent230 kV300 MW5.1 yrs59.4
Beale Farm PropertiesShovel-Ready——5.1 yrs49.7
General Thomas HighwayShovel-Ready——5.1 yrs49.7
Ivor LabShovel-Ready——5.1 yrs49.3
Southampton Commerce and Logistics CenterShovel-Ready——5.1 yrs49.3
Fullers Mill RoadShovel-Ready——5.1 yrs49.1
Southampton Business ParkShovel-Ready——5.1 yrs49.1
Southampton ParkwayShovel-Ready——5.1 yrs49.0
Councill - SouthShovel-Ready——5.1 yrs48.8

Every scored site in Southampton

All 10 sites, best first.

Southampton datacenter FAQ

How many datacenter sites are in Southampton?

10 scored datacenter candidate sites, averaging 51.3/100 DC Readiness. That is the 104th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Southampton?

BOYKINS scores 59.5/100 DC Readiness, the highest of the 10 scored sites in Southampton (a substation-adjacent site).

Does Southampton offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Southampton?

FEMA's National Risk Index rates Southampton as "Relatively Moderate" (score 30).

What are industrial electricity rates in Southampton?

Average industrial electricity is 5.25¢/kWh and commercial is 5.47¢/kWh in Southampton.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Southampton, Virginia”, https://gridcensus.com/datacenter-sites/virginia/southampton (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Southampton, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.