Datacenter Sites in ROCKBRIDGE, Virginia

ROCKBRIDGE has 40 scored datacenter candidate sites averaging 56.4/100 DC Readiness, with a catalogued aggregate of 6,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

40
Candidate sites
56.4/100
Avg DC Readiness
6,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ROCKBRIDGE

Site-selection context for ROCKBRIDGE

Yessales_tax_exemption
Datacenter tax incentive
6.79¢/kWh
Commercial electricity
5.30¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,763
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in ROCKBRIDGE

Top datacenter sites in ROCKBRIDGE
SiteTypeVoltageCapacityQueue waitScore
LEXINGTONSubstation-Adjacent500 kV1,000 MW3.8 yrs61.9
Greenfield (LEXINGTON - CLOVERDALE EAST)Greenfield500 kV1,000 MW2.8 yrs58.5
BARR MARINE BY E D M, INC. (NOT AVAILABLE)Manufacturing3.5 yrs54.3
LEES CARPET (CARPET AND RUG MILLS)Manufacturing3.5 yrs54.3
POWERSYSTEMS INTERNATIONAL (MOTOR AND GENERATOR MANUFACTURING)Manufacturing3.5 yrs54.3
FEI LTD. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing3.5 yrs54.3
CONROCK (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs54.1
BARGER & SON, CHARLES W. (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs54.0
SHENANDOAH FRAMING, INC. (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.0
BLUE RIDGE LUMBER CO., LLC (SAWMILLS)Manufacturing3.5 yrs53.5
BASE-X, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing3.5 yrs53.3
FITZGERALD LUMBER & LOG CO., INC. (SAWMILLS)Manufacturing3.5 yrs53.3
NORTH FORK LUMBER (SAWMILLS)Manufacturing3.5 yrs53.2
UNKNOWN121434Substation-Adjacent115 kV100 MW3.8 yrs53.2
TAP138723Substation-Adjacent115 kV100 MW3.8 yrs53.2
GOSHENSubstation-Adjacent115 kV100 MW3.8 yrs53.2
FAIRFIELDSubstation-Adjacent115 kV100 MW3.8 yrs53.2
DEACON & SONS TIMBER, INC., W. R. (SAWMILLS)Manufacturing3.5 yrs52.8
SHUMATE, INC., GEORGE C. (SAWMILLS)Manufacturing3.5 yrs52.7
Holland PropertyShovel-Ready3.8 yrs52.2
BURKE-PARSONS-BOWLBY CORP. (WOOD PRESERVATION)Manufacturing3.5 yrs52.0
Mine SiteFormer Mine3.8 yrs51.7
Berkstresser - Reveley FarmShovel-Ready3.8 yrs51.3
NorthpointeShovel-Ready3.8 yrs50.9
Raphine Enterprise ParkShovel-Ready3.8 yrs50.7

ROCKBRIDGE datacenter FAQ

How many datacenter sites are in ROCKBRIDGE?
40 scored datacenter candidate sites, averaging 56.4/100 DC Readiness.
Does ROCKBRIDGE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in ROCKBRIDGE?
FEMA's National Risk Index rates ROCKBRIDGE as "Relatively Moderate" (score 30).
What are industrial electricity rates in ROCKBRIDGE?
Average industrial electricity is 5.30¢/kWh and commercial is 6.79¢/kWh in ROCKBRIDGE.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROCKBRIDGE, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.